X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0866103616022

Well Details

Well ID: 0866103616022
Loading map...
Location: 02/16-36-086-10W6/2
Location Alias: 02/16-36-86-10 W6M
Location Alias 2: 02/16-36-086-10 W6/02
Country: Canada
Province: Alberta
Township: 086
Meridian: 6
Range: 10
Section: 36
County/Municipality: Clear Hills County
Well Name: EEL WORSLEY 16-36-86-10
Operator Name: Enercapita Energy Ltd.
License Number: 0313251
License Date: 2004-08-12
License Status: Issued
Spud Date: 2004-10-13
Final Drill Date: 2004-10-17
Well Total Depth: 1430.00 m
Surface Hole Latitude: 56.506269
Surface Hole Longitude: -119.429780

For data sources see[1][2]

Well History

Date Event
2004-08-12 Obtained License
2004-10-14 Surface Casing Operation Performed
2004-10-17 Finished Drilling
2004-10-17 Well Mode changed to Drilled and Cased
2004-10-18 Well Log Performed
2004-10-19 Production Casing Operation Performed
2004-10-20 Rig Released
2004-10-27 Perforation Treatment Performed - Jet Perforation
2004-10-30 Perforation Treatment Performed - Jet Perforation
2004-11-09 Well Began Production
2004-11-09 Well Fluid changed to Gas
2004-11-09 Well Mode changed to Flowing
2009-05-01 Well Fluid changed to Gas
2009-05-01 Well Mode changed to Suspended
2010-01-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-01-26 Perforation Treatment Performed - Cement Squeeze
2010-01-26 Plug Back Performed
2010-01-26 Well Fluid changed to Gas
2010-01-26 Well Log Performed
2010-01-26 Well Mode changed to Abandoned Zone
2010-01-28 Perforation Treatment Performed - Jet Perforation
2010-01-28 Well Log Performed
2010-01-29 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-02-01 Perforation Treatment Performed - Jet Perforation
2010-02-01 Well Log Performed
2010-02-02 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-02-03 Perforation Treatment Performed - Jet Perforation
2010-02-03 Well Log Performed
2010-02-04 Perforation Treatment Performed - Jet Perforation
2010-02-04 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2004-10-27 Perforation 1389.00 1390.00 17
2010-02-03 Perforation 1019.80 1029.00 17
2010-02-04 Perforation 1012.00 1013.00 17
2010-02-04 Perforation 1014.50 1016.50 17
2004-10-30 Perforation 968.00 970.00 17
2010-01-26 Packing Device Capped w/Cement 1375.00 1383.00 0
2010-01-26 Cement Squeeze 968.00 970.00 0
2010-01-28 Perforation 1107.00 1108.50 17
2010-01-28 Perforation 1110.00 1111.00 17
2010-01-29 Acid Treatment 1107.00 1111.00 0
2010-02-01 Perforation 1099.50 1101.00 17
2010-02-02 Acid Treatment 1099.50 1101.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2004 1348 0.0 0.0 0.0
2005 7604 0.0 0.0 0.0
2006 7957 0.0 0.0 0.0
2007 744 0.0 0.0 0.0

For data sources see[5]

References