If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0866033210003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.504739,"lon":-118.430676,"icon":""}]} |
| Location: 00/10-32-086-03W6/3 | |
| Location Alias: 00/10-32-86-03 W6M | |
| Location Alias 2: 00/10-32-086-03 W6/03 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 086 | |
| Meridian: 6 | |
| Range: 03 | |
| Section: 32 | |
| County/Municipality: Clear Hills County | |
| Well Name: DEVON HINES 10-32-86-3 | |
| Operator Name: Shoreline Energy Corp. | |
| License Number: 0099856 | |
| License Date: 1982-12-20 | |
| License Status: Abandoned | |
| Spud Date: 1982-12-31 | |
| Final Drill Date: 1983-01-05 | |
| Well Total Depth: 1098.00 m | |
| Surface Hole Latitude: 56.504739 | |
| Surface Hole Longitude: -118.430676 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1982-12-20 | Obtained License |
| 1983-01-05 | Finished Drilling |
| 1983-01-05 | Well Mode changed to Drilled and Cased |
| 1983-01-06 | Drill Stem Test Performed |
| 1983-01-07 | Drill Stem Test Performed |
| 1983-01-08 | Drill Stem Test Performed |
| 1983-01-09 | Drill Stem Test Performed |
| 1983-01-10 | Drill Stem Test Performed |
| 1983-01-11 | Production Casing Operation Performed |
| 1984-10-22 | Perforation Treatment Performed - Jet Perforation |
| 1984-10-24 | Perforation Treatment Performed - Jet Perforation |
| 1992-05-13 | Perforation Treatment Performed - Jet Perforation |
| 1992-05-13 | Well Log Performed |
| 1992-10-06 | Well Log Performed |
| 1992-10-08 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1992-10-08 | Perforation Treatment Performed - Cement Squeeze |
| 1992-10-09 | Well Log Performed |
| 1992-10-10 | Well Log Performed |
| 1992-10-11 | Perforation Treatment Performed - Jet Perforation |
| 1992-10-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1992-10-13 | Perforation Treatment Performed - Cement Squeeze |
| 1992-10-16 | Well Log Performed |
| 1992-10-17 | Perforation Treatment Performed - Jet Perforation |
| 1992-10-20 | Well Began Production |
| 1992-10-20 | Well Fluid changed to Gas |
| 1992-10-20 | Well Mode changed to Flowing |
| 1994-03-18 | Well Log Performed |
| 1994-03-19 | Perforation Treatment Performed - Jet Perforation |
| 1994-03-27 | Well Log Performed |
| 1994-03-30 | Perforation Treatment Performed - Jet Perforation |
| 1999-01-30 | Well Log Performed |
| 1999-02-01 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1999-02-01 | Plug Back Performed |
| 1999-02-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1999-02-02 | Perforation Treatment Performed - Cement Squeeze |
| 1999-02-02 | Plug Back Performed |
| 1999-02-02 | Well Fluid changed to Gas |
| 1999-02-02 | Well Mode changed to Flowing |
| 1999-02-04 | Well Log Performed |
| 1999-02-05 | Perforation Treatment Performed - Jet Perforation |
| 1999-02-05 | Well Log Performed |
| 1999-02-06 | Perforation Treatment Performed - Jet Perforation |
| 1999-03-02 | Well Fluid changed to Gas |
| 1999-03-02 | Well Mode changed to Flowing |
| 1999-03-03 | Well Fluid changed to Gas |
| 1999-03-03 | Well Mode changed to Flowing |
| 2008-02-01 | Well Fluid changed to Gas |
| 2008-02-01 | Well Mode changed to Suspended |
| 2018-11-03 | Well Log Performed |
| 2018-11-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2018-11-04 | Plug Back Performed |
| 2018-11-04 | Well Fluid changed to Gas |
| 2018-11-04 | Well Log Performed |
| 2018-11-04 | Well Mode changed to Abandoned Zone |
| 2019-01-25 | Well Log Performed |
| 2019-01-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2019-01-29 | Perforation Treatment Performed - Cement Squeeze |
| 2019-01-29 | Perforation Treatment Performed - Jet Perforation |
| 2019-01-29 | Plug Back Performed |
| 2019-01-29 | Well Log Performed |
| 2019-02-02 | Well Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1984-10-22 | Perforation | 966.00 | 967.00 | 13 |
| 1992-10-17 | Perforation | 759.50 | 761.50 | 13 |
| 1994-03-19 | Perforation | 759.50 | 761.50 | 14 |
| 1994-03-19 | Perforation | 763.00 | 765.00 | 14 |
| 1994-03-30 | Perforation | 966.00 | 967.00 | 14 |
| 1994-03-30 | Perforation | 968.50 | 972.00 | 14 |
| 1999-02-01 | Packing Device Capped w/Cement | 952.00 | 960.00 | 0 |
| 1999-02-02 | Packing Device Capped w/Cement | 927.00 | 935.00 | 0 |
| 1999-02-02 | Cement Squeeze | 759.50 | 765.00 | 0 |
| 1999-02-05 | Perforation | 786.50 | 787.50 | 13 |
| 1999-02-06 | Perforation | 673.00 | 673.50 | 13 |
| 1984-10-22 | Perforation | 968.50 | 971.50 | 13 |
| 2018-11-04 | Packing Device Capped w/Cement | 747.00 | 755.00 | 0 |
| 2018-11-04 | Packing Device Capped w/Cement | 655.00 | 663.00 | 0 |
| 2019-01-29 | Perforation | 298.00 | 299.00 | 13 |
| 2019-01-29 | Cement Squeeze | 298.00 | 299.00 | 0 |
| 2019-01-29 | Packing Device Capped w/Cement | 283.00 | 293.00 | 0 |
| 1984-10-24 | Perforation | 942.50 | 946.50 | 13 |
| 1992-05-13 | Perforation | 969.00 | 972.00 | 13 |
| 1992-10-08 | Acid Treatment | 942.50 | 946.50 | 0 |
| 1992-10-08 | Cement Squeeze | 942.50 | 946.50 | 0 |
| 1992-10-11 | Perforation | 942.00 | 943.50 | 13 |
| 1992-10-13 | Acid Treatment | 942.00 | 943.50 | 0 |
| 1992-10-13 | Cement Squeeze | 942.00 | 943.50 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1992 | 1664 | 0.0 | 0.0 | 0.0 |
| 1993 | 8252 | 0.0 | 0.0 | 0.0 |
| 1994 | 7529 | 0.0 | 0.0 | 0.0 |
| 1995 | 8667 | 0.0 | 0.0 | 0.0 |
| 1996 | 8656 | 0.0 | 0.0 | 0.0 |
| 1997 | 8279 | 0.0 | 0.0 | 0.0 |
| 1998 | 1215 | 0.0 | 0.0 | 0.0 |
| 1999 | 6299 | 0.0 | 0.0 | 0.0 |
| 2000 | 7682 | 0.0 | 0.0 | 0.0 |
| 2001 | 301 | 0.0 | 0.0 | 0.0 |
| 2007 | 738 | 0.0 | 0.0 | 0.0 |
| 2008 | 742 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2019-01-30 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]