X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0865123602000

Well Details

Well ID: 0865123602000
Loading map...
Location: 00/02-36-086-12W5/0
Location Alias: 00/02-36-86-12 W5M
Location Alias 2: 00/02-36-086-12 W5/00
Country: Canada
Province: Alberta
Township: 086
Meridian: 5
Range: 12
Section: 36
County/Municipality: Northern Sunrise County
Well Name: AMOCO KITTY 2-36-86-12
Operator Name: BP Canada Energy Group ULC
License Number: 0104870
License Date: 1983-12-22
License Status: RecCertified
Spud Date: 1984-01-06
Final Drill Date: 1984-01-22
Well Total Depth: 1540.00 m
Surface Hole Latitude: 56.494791
Surface Hole Longitude: -115.752323

For data sources see[1][2]

Well History

Date Event
1983-12-22 Obtained License
1984-01-06 Well Log Performed
1984-01-21 Drill Stem Test Performed
1984-01-22 Finished Drilling
1984-01-22 Well Mode changed to Drilled and Cased
1984-01-23 Well Log Performed
1984-01-24 Production Casing Operation Performed
1984-02-08 Perforation Treatment Performed - Jet Perforation
1984-02-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-02-22 Well Began Production
1984-02-22 Well Fluid changed to Crude Oil
1984-02-22 Well Mode changed to Pumping
1986-04-01 Well Fluid changed to Crude Oil
1986-04-01 Well Mode changed to Suspended
1991-03-02 Well Log Performed
1991-03-04 Well Log Performed
1991-03-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-03-05 Plug Back Performed
1991-03-07 Perforation Treatment Performed - Cement Plug
1991-03-08 Perforation Treatment Performed - Cement Plug
1991-03-08 Well Fluid changed to Crude Oil
1991-03-08 Well Mode changed to Abandoned
1991-03-15 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-02-08 Perforation 1489.50 1493.50 13
1984-02-08 Perforation 1477.50 1482.50 13
1984-02-09 Acid Treatment 1477.50 1493.50 0
1991-03-05 Packing Device Capped w/Cement 1460.00 1468.00 0
1991-03-07 Cement Plug 700.00 740.00 0
1991-03-08 Cement Plug 696.80 714.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 1028 0.0 0.0 0.0
1985 2031 0.0 0.0 0.0
1986 1560 0.0 0.0 0.0

For data sources see[5]

References