X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0865092614000

Well Details

Well ID: 0865092614000
Loading map...
Location: 00/14-26-086-09W5/0
Location Alias: 00/14-26-86-09 W5M
Location Alias 2: 00/14-26-086-09 W5/00
Country: Canada
Province: Alberta
Township: 086
Meridian: 5
Range: 09
Section: 26
County/Municipality: Northern Sunrise County
Well Name: PPR LOON 14-26-86-9
Operator Name: Prairie Provident Resources Canada Ltd.
License Number: 0444124
License Date: 2012-02-14
License Status: Issued
Spud Date: 2012-02-14
Final Drill Date: 2012-02-24
Well Total Depth: 2805.00 m
Surface Hole Latitude: 56.479055
Surface Hole Longitude: -115.310895

For data sources see[1][2]

Well History

Date Event
2012-02-14 Obtained License
2012-02-15 Surface Casing Operation Performed
2012-02-18 Direction Drilling Operation Performed - Horizontal
2012-02-20 Well Log Performed
2012-02-24 Finished Drilling
2012-02-24 Well Log Performed
2012-02-24 Well Mode changed to Drilled and Cased
2012-02-25 Production Casing Operation Performed
2012-02-26 Rig Released
2012-02-29 Well Log Performed
2012-03-03 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-04 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-06 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-07 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-24 Well Began Production
2012-03-24 Well Fluid changed to Crude Oil
2012-03-24 Well Mode changed to Pumping
2014-03-03 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-02-14 Chinook Drilling Inc. 6 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-02-18 1112.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-03-03 Multi-Stage Fracture 2782.00 2782.10 0
2012-03-06 Multi-Stage Fracture 2239.30 2239.40 0
2012-03-06 Multi-Stage Fracture 2180.80 2180.90 0
2012-03-06 Multi-Stage Fracture 2121.50 2121.60 0
2012-03-07 Multi-Stage Fracture 2070.80 2070.90 0
2012-03-07 Multi-Stage Fracture 2011.50 2011.60 0
2012-03-07 Multi-Stage Fracture 1952.20 1952.30 0
2012-03-07 Multi-Stage Fracture 1901.50 1901.60 0
2012-03-07 Multi-Stage Fracture 1842.10 1842.20 0
2012-03-07 Multi-Stage Fracture 1792.70 1792.80 0
2012-03-07 Multi-Stage Fracture 1733.50 1733.60 0
2012-03-03 Multi-Stage Fracture 2730.60 2730.70 0
2012-03-07 Multi-Stage Fracture 1676.10 1676.20 0
2012-03-07 Multi-Stage Fracture 1626.90 1627.00 0
2012-03-07 Multi-Stage Fracture 1577.60 1577.70 0
2012-03-07 Multi-Stage Fracture 1505.90 1506.00 0
2014-03-03 Acid Treatment 2782.00 2782.10 0
2014-03-03 Acid Treatment 2730.60 2730.70 0
2014-03-03 Acid Treatment 2663.60 2663.70 0
2014-03-03 Acid Treatment 2612.60 2612.70 0
2014-03-03 Acid Treatment 2553.60 2553.70 0
2014-03-03 Acid Treatment 2494.40 2494.50 0
2012-03-03 Multi-Stage Fracture 2663.60 2663.70 0
2014-03-03 Acid Treatment 2435.10 2435.20 0
2014-03-03 Acid Treatment 2375.80 2375.90 0
2014-03-03 Acid Treatment 2239.30 2239.40 0
2014-03-03 Acid Treatment 2180.80 2180.90 0
2014-03-03 Acid Treatment 2121.50 2121.60 0
2014-03-03 Acid Treatment 2070.80 2070.90 0
2014-03-03 Acid Treatment 2011.50 2011.60 0
2014-03-03 Acid Treatment 1952.20 1952.30 0
2014-03-03 Acid Treatment 1901.50 1901.60 0
2014-03-03 Acid Treatment 1842.10 1842.20 0
2012-03-04 Multi-Stage Fracture 2612.60 2612.70 0
2014-03-03 Acid Treatment 1792.70 1792.80 0
2014-03-03 Acid Treatment 1733.50 1733.60 0
2014-03-03 Acid Treatment 1676.10 1676.20 0
2014-03-03 Acid Treatment 1626.90 1627.00 0
2014-03-03 Acid Treatment 1577.60 1577.70 0
2014-03-03 Acid Treatment 1505.90 1506.00 0
2014-03-03 Acid Treatment 2316.50 2316.60 0
2012-03-06 Multi-Stage Fracture 2553.60 2553.70 0
2012-03-06 Multi-Stage Fracture 2494.40 2494.50 0
2012-03-06 Multi-Stage Fracture 2435.10 2435.20 0
2012-03-06 Multi-Stage Fracture 2375.80 2375.90 0
2012-03-06 Multi-Stage Fracture 2316.50 2316.60 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 6328 0.0 0.0 0.0
2013 8103 0.0 0.0 0.0
2014 8563 0.0 0.0 0.0
2015 8581 0.0 0.0 0.0
2016 8684 0.0 0.0 0.0
2017 8731 0.0 0.0 0.0
2018 8363 0.0 0.0 0.0
2019 8668 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-02-28 No Incident Encountered 0.00 0.00

For data sources see[8]

References