X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0856121012003

Well Details

Well ID: 0856121012003
Loading map...
Location: 00/12-10-085-12W6/3
Location Alias: 00/12-10-85-12 W6M
Location Alias 2: 00/12-10-085-12 W6/03
Country: Canada
Province: Alberta
Township: 085
Meridian: 6
Range: 12
Section: 10
County/Municipality: Clear Hills County
Well Name: EEL BDYLKS 12-10-85-12
Operator Name: Enercapita Energy Ltd.
License Number: 0195162
License Date: 1996-12-13
License Status: Suspension
Spud Date: 1997-01-05
Final Drill Date: 1997-01-18
Well Total Depth: 1905.00 m
Surface Hole Latitude: 56.358660
Surface Hole Longitude: -119.816363

For data sources see[1][2]

Well History

Date Event
1996-12-13 Obtained License
1997-01-06 Surface Casing Operation Performed
1997-01-16 Drill Stem Test Performed
1997-01-16 Well Log Performed
1997-01-18 Finished Drilling
1997-01-18 Production Casing Operation Performed
1997-01-18 Rig Released
1997-01-18 Well Mode changed to Drilled and Cased
1997-02-11 Perforation Treatment Performed - Jet Perforation
1997-02-12 Perforation Treatment Performed - Jet Perforation
1997-02-15 Well Log Performed
1997-04-09 Perforation Treatment Performed - Jet Perforation
2002-10-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-10-05 Plug Back Performed
2002-10-05 Well Log Performed
2002-10-09 Perforation Treatment Performed - Jet Perforation
2002-10-09 Well Log Performed
2002-11-04 Well Began Production
2002-11-04 Well Fluid changed to Gas
2002-11-04 Well Mode changed to Flowing
2003-04-01 Well Structure changed to Commingled
2007-03-22 Perforation Treatment Performed - Jet Perforation
2007-03-23 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-08-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-08-25 Plug Back Performed
2007-08-25 Well Mode changed to Abandoned Zone
2007-08-25 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-02-11 Perforation 1832.50 1833.70 18
2007-03-22 Perforation 1268.00 1269.00 17
2007-03-23 Acid Treatment 1268.00 1269.00 0
2007-08-25 Packing Device Capped w/Cement 1250.40 1258.40 0
2007-08-25 Packing Device Capped w/Cement 1072.00 1080.00 0
2007-08-25 Packing Device Capped w/Cement 1034.00 1042.00 0
1997-02-11 Perforation 1828.50 1830.50 18
1997-02-11 Perforation 1826.00 1827.00 18
1997-02-12 Perforation 1821.00 1822.50 18
1997-04-09 Perforation 1090.00 1091.50 18
1997-04-09 Perforation 1107.50 1109.50 18
1997-04-09 Perforation 1100.50 1102.50 18
2002-10-05 Packing Device Capped w/Cement 1802.00 1810.00 0
2002-10-09 Perforation 1050.00 1052.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 1376 0.0 0.0 0.0
2003 2113 0.0 0.0 0.0

For data sources see[5]

References