If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0856113310000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.415882,"lon":-119.67004,"icon":""}]} |
| Location: 00/10-33-085-11W6/0 | |
| Location Alias: 00/10-33-85-11 W6M | |
| Location Alias 2: 00/10-33-085-11 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 085 | |
| Meridian: 6 | |
| Range: 11 | |
| Section: 33 | |
| County/Municipality: Clear Hills County | |
| Well Name: EEL HILL 10-33-85-11 | |
| Operator Name: Enercapita Energy Ltd. | |
| License Number: 0062988 | |
| License Date: 1977-02-28 | |
| License Status: Issued | |
| Spud Date: 1977-03-04 | |
| Final Drill Date: 1977-03-09 | |
| Well Total Depth: 1252.70 m | |
| Surface Hole Latitude: 56.415882 | |
| Surface Hole Longitude: -119.670040 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1977-02-28 | Obtained License |
| 1977-03-09 | Finished Drilling |
| 1977-03-10 | Drill Stem Test Performed |
| 1977-03-11 | Drill Stem Test Performed |
| 1977-03-12 | Drill Stem Test Performed |
| 1977-03-13 | Production Casing Operation Performed |
| 1977-03-19 | Perforation Treatment Performed - Jet Perforation |
| 1977-09-29 | Well Mode changed to Drilled and Cased |
| 1982-11-01 | Well Began Production |
| 1982-11-01 | Well Fluid changed to Gas |
| 1982-11-01 | Well Mode changed to Flowing |
| 1989-03-31 | Well Fluid changed to Gas |
| 1989-03-31 | Well Mode changed to Suspended |
| 1993-08-31 | Perforation Treatment Performed - Jet Perforation |
| 1993-09-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1977-03-19 | Perforation | 990.00 | 991.20 | 13 |
| 1977-03-19 | Perforation | 993.60 | 995.50 | 13 |
| 1993-08-31 | Perforation | 1015.00 | 1018.00 | 13 |
| 1993-09-02 | Packing Device Capped w/Cement | 1003.00 | 1011.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1982 | 131 | 0.0 | 0.0 | 0.0 |
| 1983 | 3339 | 0.0 | 0.0 | 0.0 |
| 1984 | 1906 | 0.0 | 0.0 | 0.0 |
| 1985 | 2936 | 0.0 | 0.0 | 0.0 |
| 1986 | 2761 | 0.0 | 0.0 | 0.0 |
| 1987 | 5196 | 0.0 | 0.0 | 0.0 |
| 1988 | 5148 | 0.0 | 0.0 | 0.0 |
| 1989 | 1827 | 0.0 | 0.0 | 0.0 |
For data sources see[5]