X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0856033506002

Well Details

Well ID: 0856033506002
Loading map...
Location: 00/06-35-085-03W6/2
Location Alias: 00/06-35-85-03 W6M
Location Alias 2: 00/06-35-085-03 W6/02
Country: Canada
Province: Alberta
Township: 085
Meridian: 6
Range: 03
Section: 35
County/Municipality: Clear Hills County
Well Name: LAKERIDGE HINES 6-35-85-3
Operator Name: Shoreline Energy Corp.
License Number: 0052087
License Date: 1974-12-03
License Status: Suspension
Spud Date: 1975-01-05
Final Drill Date: 1975-01-15
Well Total Depth: 1055.50 m
Surface Hole Latitude: 56.411837
Surface Hole Longitude: -118.360834

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1974-12-03 Obtained License
1975-01-12 Drill Stem Test Performed
1975-01-13 Drill Stem Test Performed
1975-01-15 Finished Drilling
1975-01-15 Well Mode changed to Drilled and Cased
1975-01-16 Drill Stem Test Performed
1975-01-17 Drill Stem Test Performed
1975-01-18 Production Casing Operation Performed
1975-10-01 Perforation Treatment Performed - Jet Perforation
1975-10-02 Perforation Treatment Performed - Jet Perforation
1976-05-04 Well Began Production
1976-05-04 Well Fluid changed to Gas
1976-05-04 Well Mode changed to Flowing
1981-07-27 Perforation Treatment Performed - Jet Perforation
1981-07-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-10-04 Perforation Treatment Performed - Cement Squeeze
1984-10-04 Plug Back Performed
1984-10-04 Well Fluid changed to Gas
1984-10-04 Well Mode changed to Abandoned Zone
1984-10-07 Perforation Treatment Performed - Jet Perforation
1984-10-08 Perforation Treatment Performed - Jet Perforation
1984-10-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-10-09 Plug Back Performed
1986-01-09 Perforation Treatment Performed - Cement Squeeze
1986-01-09 Plug Back Performed
1986-01-12 Perforation Treatment Performed - Jet Perforation
1986-01-12 Well Log Performed
1986-01-13 Perforation Treatment Performed - Jet Perforation
1986-01-14 Well Log Performed
1992-09-01 Well Log Performed
1992-09-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-09-02 Plug Back Performed
1992-09-03 Perforation Treatment Performed - Jet Perforation
1992-09-11 Perforation Treatment Performed - Remedial Casing
1992-09-13 Well Log Performed
1992-09-14 Perforation Treatment Performed - Jet Perforation
1997-02-25 Well Log Performed
1997-02-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-02-27 Perforation Treatment Performed - Cement Squeeze
1997-02-27 Plug Back Performed
1997-02-27 Well Log Performed
1997-02-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-02-28 Perforation Treatment Performed - Cement Squeeze
1997-02-28 Perforation Treatment Performed - Jet Perforation
1997-03-01 Well Log Performed
1997-03-02 Perforation Treatment Performed - Jet Perforation
1997-03-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-03-03 Perforation Treatment Performed - Cement Squeeze
1997-03-03 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-10-01 Perforation 918.70 919.90 3
1984-10-08 Perforation 937.60 938.50 13
1984-10-08 Perforation 939.70 940.30 13
1984-10-09 Packing Device Capped w/Cement 988.00 996.00 0
1986-01-09 Cement Squeeze 932.10 940.30 0
1986-01-09 Cement Squeeze 918.70 919.90 0
1986-01-12 Perforation 1010.10 1013.20 13
1986-01-13 Perforation 1035.00 1036.80 13
1992-09-02 Packing Device Capped w/Cement 1020.00 1030.00 0
1992-09-02 Packing Device Capped w/Cement 997.00 1005.00 0
1992-09-03 Perforation 581.00 581.50 13
1975-10-02 Perforation 904.60 905.90 3
1992-09-03 Perforation 592.00 592.50 13
1992-09-11 Remedial Casing Cementing 581.00 592.50 0
1992-09-14 Perforation 595.60 595.90 13
1997-02-27 Cement Squeeze 595.60 595.90 0
1997-02-27 Packing Device Capped w/Cement 565.00 580.00 0
1997-02-28 Perforation 548.70 549.00 13
1997-02-28 Perforation 555.70 556.00 13
1997-02-28 Cement Squeeze 548.70 549.00 0
1997-02-28 Packing Device Capped w/Cement 538.00 554.00 0
1997-03-02 Perforation 297.70 300.00 13
1981-07-27 Perforation 909.80 910.70 10
1997-03-03 Cement Squeeze 297.70 300.00 0
1997-03-03 Packing Device Capped w/Cement 282.00 294.00 0
1981-07-28 Acid Treatment 909.80 910.70 0
1984-10-04 Cement Squeeze 904.60 910.70 0
1984-10-07 Perforation 1010.10 1013.20 13
1984-10-08 Perforation 932.10 933.30 13
1984-10-08 Perforation 933.90 934.50 13
1984-10-08 Perforation 936.40 937.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 4128 0.0 0.0 0.0
1977 6512 0.0 0.0 0.0
1978 6924 0.0 0.0 0.0
1979 7796 0.0 0.0 0.0
1980 4634 0.0 0.0 0.0
1981 105 0.0 0.0 0.0
1982 168 0.0 0.0 0.0

For data sources see[5]

References