If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0855182105030 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.381664,"lon":-116.790226,"icon":""}]} |
Location: 03/05-21-085-18W5/0 | |
Location Alias: 03/05-21-85-18 W5M | |
Location Alias 2: 03/05-21-085-18 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 085 | |
Meridian: 5 | |
Range: 18 | |
Section: 21 | |
County/Municipality: Northern Sunrise County | |
Well Name: SHELL 10-30 PRISP CADOT 5-21-85-18 | |
Operator Name: Shell Canada Limited | |
License Number: 0069919 | |
License Date: 1978-06-05 | |
License Status: RecExempt | |
Spud Date: 1978-07-11 | |
Final Drill Date: 1978-07-17 | |
Well Total Depth: 577.80 m | |
Surface Hole Latitude: 56.381664 | |
Surface Hole Longitude: -116.790226 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1978-06-05 | Obtained License |
1978-07-15 | Production Casing Operation Performed |
1978-07-17 | Finished Drilling |
1978-07-17 | Well Mode changed to Drilled and Cased |
1979-07-15 | Perforation Treatment Performed - Open-Hole Completion |
1979-11-01 | Well Began Production |
1979-11-01 | Well Fluid changed to Crude Bitumen |
1979-11-01 | Well Type changed to Cyclical |
1981-01-01 | Well Fluid changed to Crude Bitumen |
1981-01-01 | Well Mode changed to Pumping |
1994-09-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1994-09-23 | Plug Back Performed |
1994-09-23 | Well Fluid changed to Crude Bitumen |
1994-09-23 | Well Mode changed to Abandoned |
1994-11-01 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1979-07-15 | Open Hole/Barefoot Completion | 548.80 | 577.80 | 0 |
1994-09-23 | Packing Device Capped w/Cement | 513.40 | 528.40 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1979 | 0 | 0.0 | 0.0 | 0.0 |
1980 | 3810 | 0.0 | 0.0 | 0.0 |
1981 | 4777 | 0.0 | 0.0 | 0.0 |
1982 | 6768 | 0.0 | 0.0 | 0.0 |
1983 | 8255 | 0.0 | 0.0 | 0.0 |
1984 | 8370 | 0.0 | 0.0 | 0.0 |
1985 | 7524 | 0.0 | 0.0 | 0.0 |
1986 | 6448 | 0.0 | 0.0 | 0.0 |
1987 | 8246 | 0.0 | 0.0 | 0.0 |
1988 | 7142 | 0.0 | 0.0 | 0.0 |
1989 | 7552 | 0.0 | 0.0 | 0.0 |
1990 | 8517 | 0.0 | 0.0 | 0.0 |
1991 | 5168 | 0.0 | 0.0 | 0.0 |
For data sources see[5]