If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0854092608AC0 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.398719,"lon":-111.298309,"icon":""}]} |
| Location: AC/08-26-085-09W4/0 | |
| Location Alias: AC/08-26-85-09 W4M | |
| Location Alias 2: AC/08-26-085-09 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 085 | |
| Meridian: 4 | |
| Range: 09 | |
| Section: 26 | |
| County/Municipality: Regional Municipality of Wood Buffalo | |
| Well Name: PEX PCEJ E-3 MCMURRAY EX 8-26-85-9 | |
| Operator Name: Suncor Energy Inc. | |
| License Number: 0080721 | |
| License Date: 1980-01-29 | |
| License Status: RecCertified | |
| Spud Date: 1980-03-14 | |
| Final Drill Date: 1980-03-22 | |
| Well Total Depth: 454.00 m | |
| Surface Hole Latitude: 56.398719 | |
| Surface Hole Longitude: -111.298309 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1980-01-29 | Obtained License |
| 1980-03-20 | Surface Casing Operation Performed |
| 1980-03-22 | Finished Drilling |
| 1980-03-22 | Well Mode changed to Drilled and Cased |
| 1980-03-23 | Perforation Treatment Performed - Slotted Liner or Casing |
| 1980-03-23 | Production Casing Operation Performed |
| 1980-03-23 | Rig Released |
| 1982-05-01 | Well Began Injection |
| 1982-05-01 | Well Fluid changed to Steam |
| 1982-05-01 | Well Type changed to Injection |
| 1984-08-03 | Perforation Treatment Performed - Cement Plug |
| 1984-08-03 | Well Abandoned |
| 1984-08-03 | Well Fluid changed to Steam |
| 1984-08-03 | Well Mode changed to Abandoned |
| 1984-08-03 | Well Type changed to Injection |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1980-03-23 | Slotted Liner | 439.00 | 454.00 | 0 |
| 1984-08-03 | Cement Plug | 340.10 | 454.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1982 | 0 | 0.0 | 0.0 | 0.0 |
| 1983 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]