X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0854062806020

Well Details

Well ID: 0854062806020
Loading map...
Location: 02/06-28-085-06W4/0
Location Alias: 02/06-28-85-06 W4M
Location Alias 2: 02/06-28-085-06 W4/00
Country: Canada
Province: Alberta
Township: 085
Meridian: 4
Range: 06
Section: 28
County/Municipality: Regional Municipality of Wood Buffalo
Well Name: NEXEN CNOOC 15S01 NEWBY 6-28-85-6
Operator Name: CNOOC Petroleum North America ULC
License Number: 0447377
License Date: 2012-07-25
License Status: Issued
Spud Date: 2012-09-04
Final Drill Date: 2012-11-02
Well Total Depth: 1091.00 m
Surface Hole Latitude: 56.405272
Surface Hole Longitude: -110.903353

For data sources see[1][2]

Well History

Date Event
2012-07-25 Obtained License
2012-09-04 Direction Drilling Operation Performed - Deviate
2012-09-04 Well Mode changed to Preset
2012-09-05 Surface Casing Operation Performed
2012-10-16 Well Log Performed
2012-10-17 Direction Drilling Operation Performed - Horizontal
2012-10-17 Well Log Performed
2012-10-18 Well Log Performed
2012-10-19 Intermediate Casing Operation Performed
2012-10-26 Well Log Performed
2012-11-02 Finished Drilling
2012-11-02 Well Log Performed
2012-11-02 Well Mode changed to Drilled and Cased
2012-11-03 Liner Casing Operation Performed
2012-11-03 Perforation Treatment Performed - Slotted Liner or Casing
2012-11-03 Rig Released
2014-04-01 Well Began Production
2014-04-01 Well Type changed to Steam Assisted Gravity Drain

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-09-04 Precision Drilling Corporation 188 N/A Set Surface
2012-10-31 Precision Drilling Corporation 188 1088 Resumption

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-09-04 0.00 Deviate (5 - 79 degrees)
2012-10-17 425.60 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-11-03 Slotted Liner 568.50 1081.50 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-09-05 No Incident Encountered 0.00 0.00
2012-11-02 No Incident Encountered 0.00 0.00

For data sources see[8]

References