X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0846082109000

Well Details

Well ID: 0846082109000
Loading map...
Location: 00/09-21-084-08W6/0
Location Alias: 00/09-21-84-08 W6M
Location Alias 2: 00/09-21-084-08 W6/00
Country: Canada
Province: Alberta
Township: 084
Meridian: 6
Range: 08
Section: 21
County/Municipality: Saddle Hills County
Well Name: HARVEST CECIL 9-21-84-8
Operator Name: Harvest Operations Corp.
License Number: 0134984
License Date: 1988-07-18
License Status: Suspension
Spud Date: 1988-07-29
Final Drill Date: 1988-08-06
Well Total Depth: 1155.00 m
Surface Hole Latitude: 56.296123
Surface Hole Longitude: -119.184661

For data sources see[1][2]

Well History

Date Event
1988-07-18 Obtained License
1988-07-29 Direction Drilling Operation Performed - Deviate
1988-07-30 Surface Casing Operation Performed
1988-08-06 Finished Drilling
1988-08-06 Well Log Performed
1988-08-06 Well Mode changed to Drilled and Cased
1988-08-07 Production Casing Operation Performed
1988-08-07 Rig Released
1988-08-18 Well Log Performed
1988-08-22 Well Log Performed
1988-08-23 Perforation Treatment Performed - Jet Perforation
1988-08-23 Well Log Performed
1988-08-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-09-08 Well Began Production
1988-09-08 Well Fluid changed to Crude Oil
1988-09-08 Well Mode changed to Pumping
2002-10-31 Well Fluid changed to Crude Oil
2002-10-31 Well Mode changed to Suspended
2006-08-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-08-18 Plug Back Performed
2006-08-18 Well Fluid changed to Crude Oil
2006-08-18 Well Mode changed to Abandoned Zone
2007-09-05 Well Fluid changed to Crude Oil
2007-09-05 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1988-07-29 167.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-08-23 Perforation 1079.00 1088.00 13
1988-08-24 Acid Treatment 1079.00 1088.00 0
2006-08-18 Packing Device Capped w/Cement 1062.00 1070.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 1848 0.0 0.0 0.0
1989 4522 0.0 0.0 0.0
1990 3811 0.0 0.0 0.0
1991 3040 0.0 0.0 0.0
1992 8203 0.0 0.0 0.0
1993 8567 0.0 0.0 0.0
1994 7856 0.0 0.0 0.0
1995 8556 0.0 0.0 0.0
1996 8599 0.0 0.0 0.0
1997 6618 0.0 0.0 0.0
1998 954 0.0 0.0 0.0

For data sources see[6]

References