X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0846081008002

Well Details

Well ID: 0846081008002
Loading map...
Location: 00/08-10-084-08W6/2
Location Alias: 00/08-10-84-08 W6M
Location Alias 2: 00/08-10-084-08 W6/02
Country: Canada
Province: Alberta
Township: 084
Meridian: 6
Range: 08
Section: 10
County/Municipality: Saddle Hills County
Well Name: CNRL ET AL CECIL 8-10-84-8
Operator Name: Harvest Operations Corp.
License Number: 0129343
License Date: 1987-10-16
License Status: Abandoned
Spud Date: 1987-10-18
Final Drill Date: 1989-03-03
Well Total Depth: 1190.00 m
Surface Hole Latitude: 56.268694
Surface Hole Longitude: -119.165898

For data sources see[1][2]

Well History

Date Event
1987-10-16 Obtained License
1987-10-19 Surface Casing Operation Performed
1987-10-25 Production Casing Operation Performed
1987-11-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-11-18 Perforation Treatment Performed - Jet Perforation
1988-02-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-02-27 Perforation Treatment Performed - Cement Squeeze
1989-02-27 Plug Back Performed
1989-03-03 Finished Drilling
1989-03-03 Perforation Treatment Performed - Open-Hole Completion
1989-03-03 Well Mode changed to Drilled and Cased
1989-03-04 Perforation Treatment Performed - Abrasa-Jet Perforation
1989-03-04 Well Log Performed
1989-03-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-04-01 Well Began Injection
1989-04-01 Well Fluid changed to Water
1989-04-01 Well Type changed to Disposal
1992-09-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-05-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-09-27 Perforation Treatment Performed - Chemical Squeeze
1993-09-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-10-12 Perforation Treatment Performed - Chemical Squeeze
1994-10-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-12-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-12-16 Perforation Treatment Performed - Chemical Squeeze
1996-11-06 Well Log Performed
1996-11-07 Well Log Performed
1996-11-28 Well Log Performed
1996-12-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-12-01 Plug Back Performed
1996-12-01 Well Log Performed
1996-12-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-12-02 Perforation Treatment Performed - Jet Perforation
1996-12-02 Plug Back Performed
1996-12-02 Well Log Performed
1996-12-03 Perforation Treatment Performed - Remedial Casing
1996-12-03 Well Log Performed
1996-12-04 Perforation Treatment Performed - Jet Perforation
1996-12-04 Perforation Treatment Performed - Remedial Casing
1996-12-04 Well Abandoned
1996-12-04 Well Fluid changed to Water
1996-12-04 Well Log Performed
1996-12-04 Well Mode changed to Abandoned
1996-12-04 Well Type changed to Disposal

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1987-11-18 Perforation 1137.80 1143.00 13
1993-09-27 Chemical Squeeze 1163.00 1190.00 0
1993-09-29 Acid Treatment 1163.00 1190.00 0
1994-10-12 Chemical Squeeze 1163.00 1190.00 0
1994-10-13 Acid Treatment 1163.00 1190.00 0
1994-12-16 Chemical Squeeze 1163.00 1190.00 0
1994-12-16 Acid Treatment 1163.00 1190.00 0
1996-12-01 Packing Device Capped w/Cement 1148.00 1157.00 0
1996-12-02 Packing Device Capped w/Cement 1121.00 1130.00 0
1996-12-02 Perforation 272.00 273.00 14
1996-12-03 Remedial Casing Cementing 272.00 273.00 0
1987-11-18 Acid Treatment 1137.80 1143.00 0
1996-12-04 Perforation 240.00 241.00 14
1996-12-04 Remedial Casing Cementing 240.00 241.00 0
1988-02-03 Acid Treatment 1137.80 1143.00 0
1989-02-27 Cement Squeeze 1137.80 1143.00 0
1989-03-03 Open Hole/Barefoot Completion 1163.00 1190.00 0
1989-03-04 Hydra Jet Perforation 1163.00 1167.00 0
1989-03-05 Acid Treatment 1163.00 1190.00 0
1992-09-19 Acid Treatment 1163.00 1190.00 0
1993-05-15 Acid Treatment 1163.00 1190.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0

For data sources see[5]

References