X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0846072011002

Well Details

Well ID: 0846072011002
Loading map...
Location: 00/11-20-084-07W6/2
Location Alias: 00/11-20-84-07 W6M
Location Alias 2: 00/11-20-084-07 W6/02
Country: Canada
Province: Alberta
Township: 084
Meridian: 6
Range: 07
Section: 20
County/Municipality: Clear Hills County
Well Name: CNRL ET AL CECIL 11-20-84-7
Operator Name: Harvest Operations Corp.
License Number: 0136424
License Date: 1988-09-16
License Status: Suspension
Spud Date: 1988-09-19
Final Drill Date: 1988-09-24
Well Total Depth: 1100.00 m
Surface Hole Latitude: 56.301584
Surface Hole Longitude: -119.074401

For data sources see[1][2]

Well History

Date Event
1988-09-16 Obtained License
1988-09-20 Surface Casing Operation Performed
1988-09-24 Finished Drilling
1988-09-24 Well Log Performed
1988-09-25 Drill Stem Test Performed
1988-09-26 Production Casing Operation Performed
1988-09-26 Rig Released
1988-09-29 Well Log Performed
1988-10-01 Perforation Treatment Performed - Jet Perforation
1988-10-01 Well Log Performed
1988-10-15 Perforation Treatment Performed - Jet Perforation
1988-10-15 Well Log Performed
1988-10-15 Well Mode changed to Drilled and Cased
1988-10-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-10-20 Well Log Performed
1988-10-20 Well Mode changed to Drilled and Cased
1998-04-25 Well Began Production
1998-04-25 Well Fluid changed to Gas
1998-04-25 Well Mode changed to Flowing
1999-10-03 Well Log Performed
1999-10-04 Well Log Performed
1999-10-05 Perforation Treatment Performed - Jet Perforation
1999-10-06 Well Fluid changed to Gas
1999-10-06 Well Mode changed to Flowing
2000-01-20 Perforation Treatment Performed - Cement Squeeze
2000-01-20 Plug Back Performed
2000-01-20 Well Fluid changed to Gas
2000-01-20 Well Mode changed to Abandoned Zone
2000-01-25 Perforation Treatment Performed - Jet Perforation
2000-01-27 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-10-01 Perforation 1044.50 1045.80 13
2000-01-27 Fracture 1048.00 1061.00 0
1988-10-15 Perforation 1058.00 1061.00 13
1988-10-16 Acid Treatment 1044.50 1061.00 0
1999-10-05 Perforation 930.50 930.60 2
1999-10-05 Perforation 930.00 931.00 17
2000-01-20 Cement Squeeze 1044.50 1045.80 0
2000-01-20 Cement Squeeze 930.00 931.00 0
2000-01-25 Perforation 1048.00 1053.00 17
2000-01-25 Perforation 1058.00 1061.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 5778 0.0 0.0 0.0
1999 1122 0.0 0.0 0.0

For data sources see[5]

References