X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0846071816020

Well Details

Well ID: 0846071816020
Loading map...
Location: 02/16-18-084-07W6/0
Location Alias: 02/16-18-84-07 W6M
Location Alias 2: 02/16-18-084-07 W6/00
Country: Canada
Province: Alberta
Township: 084
Meridian: 6
Range: 07
Section: 18
County/Municipality: Clear Hills County
Well Name: HARVEST CECIL 16-18-84-7
Operator Name: Harvest Operations Corp.
License Number: 0187180
License Date: 1996-04-11
License Status: Issued
Spud Date: 1996-04-22
Final Drill Date: 1996-05-01
Well Total Depth: 1218.00 m
Surface Hole Latitude: 56.292028
Surface Hole Longitude: -119.089877

For data sources see[1][2]

Well History

Date Event
1996-04-11 Obtained License
1996-04-22 Well Log Performed
1996-04-24 Surface Casing Operation Performed
1996-04-25 Direction Drilling Operation Performed - Deviate
1996-05-01 Finished Drilling
1996-05-01 Well Log Performed
1996-05-01 Well Mode changed to Drilled and Cased
1996-05-02 Drill Stem Test Performed
1996-05-03 Production Casing Operation Performed
1996-05-04 Rig Released
1996-05-17 Well Log Performed
1996-06-27 Perforation Treatment Performed - Jet Perforation
1996-06-27 Well Log Performed
1996-07-01 Perforation Treatment Performed - Fractured
1996-07-30 Well Began Production
1996-07-30 Well Fluid changed to Crude Oil
1996-07-30 Well Mode changed to Pumping
1999-09-22 Well Log Performed
1999-09-23 Perforation Treatment Performed - Jet Perforation
1999-09-23 Well Fluid changed to Crude Oil
1999-09-23 Well Log Performed
1999-09-23 Well Mode changed to Pumping
1999-10-24 Well Fluid changed to Crude Oil
1999-10-24 Well Mode changed to Suspended
2000-09-28 Well Log Performed
2000-09-30 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-09-30 Perforation Treatment Performed - Cement Squeeze
2000-09-30 Plug Back Performed
2000-10-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-10-05 Perforation Treatment Performed - Cement Squeeze
2000-10-05 Plug Back Performed
2000-10-16 Well Fluid changed to Crude Oil
2000-10-16 Well Mode changed to Pumping
2000-10-17 Well Fluid changed to Crude Oil
2000-10-17 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1996-04-25 284.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-06-27 Perforation 1151.00 1158.00 13
2000-10-05 Cement Squeeze 992.00 993.50 0
1996-07-01 Fracture 1151.00 1158.00 0
1999-09-23 Perforation 992.50 992.70 2
1999-09-23 Perforation 992.00 993.50 20
1999-09-23 Perforation 964.00 969.00 20
2000-09-30 Acid Treatment 992.00 993.50 0
2000-09-30 Acid Treatment 964.00 969.00 0
2000-09-30 Cement Squeeze 964.00 969.00 0
2000-10-05 Acid Treatment 992.00 993.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 3510 0.0 0.0 0.0
1997 8348 0.0 0.0 0.0
1998 8248 0.0 0.0 0.0
1999 6198 0.0 0.0 0.0
2000 1802 0.0 0.0 0.0
2001 8751 0.0 0.0 0.0
2002 8378 0.0 0.0 0.0
2003 8742 0.0 0.0 0.0
2004 8619 0.0 0.0 0.0
2005 8270 0.0 0.0 0.0
2006 8672 0.0 0.0 0.0
2007 8673 0.0 0.0 0.0
2008 8491 0.0 0.0 0.0
2009 8716 0.0 0.0 0.0
2010 8392 0.0 0.0 0.0
2011 8654 0.0 0.0 0.0
2012 8616 0.0 0.0 0.0
2013 8631 0.0 0.0 0.0
2014 8254 0.0 0.0 0.0
2015 8647 0.0 0.0 0.0
2016 8766 0.0 0.0 0.0
2017 8522 0.0 0.0 0.0
2018 7234 0.0 0.0 0.0
2019 8752 0.0 0.0 0.0
2020 2179 0.0 0.0 0.0

For data sources see[6]

References