X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0846071806000

Well Details

Well ID: 0846071806000
Loading map...
Location: 00/06-18-084-07W6/0
Location Alias: 00/06-18-84-07 W6M
Location Alias 2: 00/06-18-084-07 W6/00
Country: Canada
Province: Alberta
Township: 084
Meridian: 6
Range: 07
Section: 18
County/Municipality: Saddle Hills County
Well Name: CNRL ET AL CECIL 6-18-84-7
Operator Name: Harvest Operations Corp.
License Number: 0145071
License Date: 1990-08-13
License Status: Amended
Spud Date: 1990-08-29
Final Drill Date: 1990-09-09
Well Total Depth: 2372.00 m
Surface Hole Latitude: 56.272060
Surface Hole Longitude: -119.116171

For data sources see[1][2]

Well History

Date Event
1990-08-13 Obtained License
1990-08-30 Surface Casing Operation Performed
1990-09-01 Direction Drilling Operation Performed - Horizontal
1990-09-05 Production Casing Operation Performed
1990-09-09 Finished Drilling
1990-09-09 Perforation Treatment Performed - Open-Hole Completion
1990-09-09 Well Mode changed to Drilled and Cased
1990-09-10 Well Log Performed
1990-09-12 Rig Released
1990-09-12 Well Log Performed
1990-09-19 Well Log Performed
1990-09-23 Well Began Production
1990-09-23 Well Fluid changed to Crude Oil
1990-09-23 Well Mode changed to Pumping
1990-09-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-10-28 Well Log Performed
1990-10-29 Perforation Treatment Performed - Jet Perforation
1990-11-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-01-13 Well Log Performed
1996-10-22 Perforation Treatment Performed - Open-Hole Completion
1996-10-22 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1990-09-01 949.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-09-09 Open Hole/Barefoot Completion 1169.00 1570.00 0
1990-09-25 Acid Treatment 1169.00 1570.00 0
1990-10-29 Perforation 1506.40 1520.20 20
1990-10-29 Perforation 1525.00 1529.20 20
1990-10-29 Perforation 1532.80 1537.00 20
1990-11-06 Acid Treatment 1169.00 1537.00 0
1996-10-22 Open Hole/Barefoot Completion 1169.00 2372.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 1173 0.0 0.0 0.0
1991 2401 0.0 0.0 0.0
1992 1549 0.0 0.0 0.0
1993 8471 0.0 0.0 0.0
1994 8562 0.0 0.0 0.0
1995 8604 0.0 0.0 0.0
1996 7618 0.0 0.0 0.0
1997 7100 0.0 0.0 0.0
1998 8596 0.0 0.0 0.0
1999 6609 0.0 0.0 0.0
2000 6984 0.0 0.0 0.0
2001 8699 0.0 0.0 0.0
2002 8656 0.0 0.0 0.0
2003 8664 0.0 0.0 0.0
2004 6366 0.0 0.0 0.0
2005 8293 0.0 0.0 0.0
2006 8568 0.0 0.0 0.0
2007 8470 0.0 0.0 0.0
2008 8468 0.0 0.0 0.0
2009 8267 0.0 0.0 0.0
2010 8677 0.0 0.0 0.0
2011 8657 0.0 0.0 0.0
2012 8545 0.0 0.0 0.0
2013 8609 0.0 0.0 0.0
2014 8736 0.0 0.0 0.0
2015 8414 0.0 0.0 0.0
2016 8421 0.0 0.0 0.0
2017 8285 0.0 0.0 0.0
2018 4357 0.0 0.0 0.0

For data sources see[6]

References