X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0845230406022

Well Details

Well ID: 0845230406022
Loading map...
Location: 02/06-04-084-23W5/2
Location Alias: 02/06-04-84-23 W5M
Location Alias 2: 02/06-04-084-23 W5/02
Country: Canada
Province: Alberta
Township: 084
Meridian: 5
Range: 23
Section: 04
County/Municipality: Municipal District of Peace No. 135
Well Name: CANAMAX HZ GRIMSHAW 6-4-84-23
Operator Name: Canamax Energy Ltd.
License Number: 0494173
License Date: 2019-04-10
License Status: Amended
Spud Date: 2019-07-09
Final Drill Date: 2019-07-13
Well Total Depth: 2400.00 m
Surface Hole Latitude: 56.238594
Surface Hole Longitude: -117.574093

For data sources see[1][2]


Directional Drilling

Start Date Depth (m) Reason
2019-07-10 576.70 Deviate (5 - 79 degrees)
2019-07-11 997.80 Horizontal
2019-07-12 1799.50 Horizontal

For data sources see[3]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-08-01 Multi-Stage Fracture 2348.90 2349.00 0
2019-08-01 Multi-Stage Fracture 2076.20 2076.30 0
2019-08-01 Multi-Stage Fracture 2048.80 2048.90 0
2019-08-01 Multi-Stage Fracture 2021.50 2021.60 0
2019-08-01 Multi-Stage Fracture 1994.10 1994.20 0
2019-08-01 Multi-Stage Fracture 1966.80 1966.90 0
2019-08-01 Multi-Stage Fracture 1939.40 1939.50 0
2019-08-01 Multi-Stage Fracture 1912.00 1912.10 0
2019-08-01 Multi-Stage Fracture 1886.40 1886.50 0
2019-08-01 Multi-Stage Fracture 1859.00 1859.10 0
2019-08-01 Multi-Stage Fracture 1831.70 1831.80 0
2019-08-01 Multi-Stage Fracture 2321.50 2321.60 0
2019-08-01 Multi-Stage Fracture 1777.50 1777.60 0
2019-08-01 Multi-Stage Fracture 1750.40 1750.50 0
2019-08-01 Multi-Stage Fracture 1723.00 1723.10 0
2019-08-01 Multi-Stage Fracture 1695.70 1695.80 0
2019-08-01 Multi-Stage Fracture 1668.30 1668.40 0
2019-08-01 Multi-Stage Fracture 1641.10 1641.20 0
2019-08-01 Multi-Stage Fracture 1613.90 1614.00 0
2019-08-01 Multi-Stage Fracture 1586.60 1586.70 0
2019-08-01 Multi-Stage Fracture 1559.20 1559.30 0
2019-08-02 Multi-Stage Fracture 1531.80 1531.90 0
2019-08-01 Multi-Stage Fracture 2294.20 2294.30 0
2019-08-02 Multi-Stage Fracture 1504.40 1504.50 0
2019-08-02 Multi-Stage Fracture 1477.00 1477.10 0
2019-08-02 Multi-Stage Fracture 1449.60 1449.70 0
2019-08-02 Multi-Stage Fracture 1422.20 1422.30 0
2019-08-02 Multi-Stage Fracture 1394.70 1394.80 0
2019-08-02 Multi-Stage Fracture 1367.30 1367.40 0
2019-08-02 Multi-Stage Fracture 1339.90 1340.00 0
2019-08-02 Multi-Stage Fracture 1312.70 1312.80 0
2019-08-02 Multi-Stage Fracture 1285.20 1285.30 0
2019-08-02 Multi-Stage Fracture 1258.00 1258.10 0
2019-08-01 Multi-Stage Fracture 2266.80 2266.90 0
2019-08-02 Multi-Stage Fracture 1230.60 1230.70 0
2019-08-02 Multi-Stage Fracture 1203.20 1203.30 0
2019-08-02 Multi-Stage Fracture 1176.20 1176.30 0
2019-08-02 Multi-Stage Fracture 1148.80 1148.90 0
2019-08-02 Multi-Stage Fracture 1121.40 1121.50 0
2019-08-02 Multi-Stage Fracture 1094.00 1094.10 0
2019-08-02 Multi-Stage Fracture 1066.60 1066.70 0
2019-08-02 Multi-Stage Fracture 1039.20 1039.30 0
2019-08-02 Multi-Stage Fracture 1012.20 1012.30 0
2019-08-01 Multi-Stage Fracture 2239.50 2239.60 0
2019-08-01 Multi-Stage Fracture 2212.10 2212.20 0
2019-08-01 Multi-Stage Fracture 2184.90 2185.00 0
2019-08-01 Multi-Stage Fracture 2157.60 2157.70 0
2019-08-01 Multi-Stage Fracture 2130.20 2130.30 0

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-08-01 2019-08-02 866 1,534 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Nitrogen Not Available 100 11.6451 N/A
Water 7732-18-5 100 75.8853 N/A
20/40 SiberProp Step Energy Services Crystalline Silica (Quartz) 14808-60-7 100 11.5771 N/A
SRA-1W (Resin Activator) Step Energy Services Activator Alcohols. C12-14-Secondary. Ethoxylated 84133-50-6 100 0.2537 N/A
Methyl Alcohol 67-56-1 100 0.2537 N/A
Polyethylene Glycol 25322-68-3 100 0.2537 N/A
Secure BIO-10B (Biocide) Step Energy Services Bactericide/Biocide 2-bromo-2-nitro.3-diol 52-51-7 100 0.0075 N/A
Methyl Alcohol 67-56-1 100 0.0075 N/A
SBE-2 (Breaker) Step Energy Services Breaker Non-Hazardous Ingredients Not Available 100 0.035 N/A
Sodium chloride 7647-14-5 100 0.035 N/A
SFS-1 (Clay Control) Step Energy Services Clay Control Proprietary Trade Secret 100 0.1039 N/A
Water 7732-18-5 100 0.1039 N/A
SWG-101L (Gellant) Step Energy Services Gelling Agent Guar gum 9000-30-0 100 0.4188 N/A
Petroleum distillates. hydrotreated light 64742-47-8 100 0.4188 N/A
SSI-1 (Scale Inhibitor) Step Energy Services Scale Inhibitor Methyl Alcohol 67-56-1 100 0.0075 N/A
Non-Hazardous Ingredients Not Available 100 0.0075 N/A

For data sources see[5]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-08-01 2019-08-02 Surface Water - Runoff 1643

For data sources see[6]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 3007 0.0 0.0 0.0
2020 2152 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-07-14 No Incident Encountered 0.00 0.00
2019-08-09 No Incident Encountered 0.00 0.00

For data sources see[8]

References