If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0845182113W02 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.283221,"lon":-116.798365,"icon":""}]} |
| Location: W0/13-21-084-18W5/2 | |
| Location Alias: W0/13-21-84-18 W5M | |
| Location Alias 2: W0/13-21-084-18 W5/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 084 | |
| Meridian: 5 | |
| Range: 18 | |
| Section: 21 | |
| County/Municipality: Northern Sunrise County | |
| Well Name: BAYTEX E12 HZ SEAL 13-21-84-18 | |
| Operator Name: Baytex Energy Ltd. | |
| License Number: 0415911 | |
| License Date: 2009-12-21 | |
| License Status: Amended | |
| Spud Date: 2010-01-31 | |
| Final Drill Date: 2010-02-07 | |
| Well Total Depth: 2796.00 m | |
| Surface Hole Latitude: 56.283221 | |
| Surface Hole Longitude: -116.798365 |
| Date | Event |
|---|---|
| 2009-12-21 | Obtained License |
| 2010-02-01 | Direction Drilling Operation Performed - Horizontal |
| 2010-02-02 | Intermediate Casing Operation Performed |
| 2010-02-05 | Direction Drilling Operation Performed - Horizontal |
| 2010-02-07 | Finished Drilling |
| 2010-02-07 | Well Mode changed to Drilled and Cased |
| 2010-02-08 | Perforation Treatment Performed - Open-Hole Completion |
| 2010-02-08 | Rig Released |
| 2010-02-26 | Well Began Production |
| 2010-02-26 | Well Fluid changed to Crude Bitumen |
| 2010-02-26 | Well Mode changed to Pumping |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2010-02-01 | 320.10 | Horizontal |
| 2010-02-05 | 842.00 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2010-02-08 | Open Hole/Barefoot Completion | 842.00 | 2796.00 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2010 | 7063 | 0.0 | 0.0 | 0.0 |
| 2011 | 8707 | 0.0 | 0.0 | 0.0 |
| 2012 | 8439 | 0.0 | 0.0 | 0.0 |
| 2013 | 8734 | 0.0 | 0.0 | 0.0 |
| 2014 | 8669 | 0.0 | 0.0 | 0.0 |
| 2015 | 8399 | 0.0 | 0.0 | 0.0 |
| 2016 | 8688 | 0.0 | 0.0 | 0.0 |
| 2017 | 7420 | 0.0 | 0.0 | 0.0 |
| 2018 | 8499 | 0.0 | 0.0 | 0.0 |
| 2019 | 8534 | 0.0 | 0.0 | 0.0 |
| 2020 | 2099 | 0.0 | 0.0 | 0.0 |
For data sources see[6]