If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0844113410060 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.320581,"lon":-111.642543,"icon":""}]} |
| Location: 06/10-34-084-11W4/0 | |
| Location Alias: 06/10-34-84-11 W4M | |
| Location Alias 2: 06/10-34-084-11 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 084 | |
| Meridian: 4 | |
| Range: 11 | |
| Section: 34 | |
| County/Municipality: Regional Municipality of Wood Buffalo | |
| Well Name: GHOPCO HZBP(106) HANGSTN 10-34-84-11 | |
| Operator Name: Greenfire Hangingstone Operating Corporation | |
| License Number: 0212103 | |
| License Date: 1998-01-15 | |
| License Status: Abandoned | |
| Spud Date: 1998-03-17 | |
| Final Drill Date: 1998-03-22 | |
| Well Total Depth: 1075.00 m | |
| Surface Hole Latitude: 56.320581 | |
| Surface Hole Longitude: -111.642543 |
| Date | Event |
|---|---|
| 1998-01-15 | Obtained License |
| 1998-03-17 | Direction Drilling Operation Performed - Horizontal |
| 1998-03-19 | Surface Casing Operation Performed |
| 1998-03-22 | Finished Drilling |
| 1998-03-23 | Liner Casing Operation Performed |
| 1998-03-23 | Perforation Treatment Performed - Open-Hole Completion |
| 1998-03-23 | Perforation Treatment Performed - Slotted Liner or Casing |
| 1998-03-25 | Rig Released |
| 1998-03-25 | Well Mode changed to Drilled and Cased |
| 1998-05-01 | Well Log Performed |
| 1999-04-13 | Well Began Production |
| 1999-04-13 | Well Type changed to Steam Assisted Gravity Drain |
| 2017-06-15 | Perforation Treatment Performed - Cement Plug |
| 2017-06-15 | Plug Back Performed |
| 2017-06-15 | Well Mode changed to Abandoned Zone |
| 2017-06-15 | Well Type changed to Steam Assisted Gravity Drain |
| 2017-06-16 | Perforation Treatment Performed - Jet Perforation |
| 2017-06-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2017-06-17 | Perforation Treatment Performed - Cement Squeeze |
| 2017-06-17 | Perforation Treatment Performed - Jet Perforation |
| 2017-06-17 | Plug Back Performed |
| 2017-06-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2017-06-18 | Plug Back Performed |
| 2017-06-19 | Perforation Treatment Performed - Cement Plug |
| 2017-06-19 | Perforation Treatment Performed - Cement Squeeze |
| 2017-06-19 | Perforation Treatment Performed - Jet Perforation |
| 2017-06-19 | Plug Back Performed |
| 2017-06-30 | Well Abandoned |
| 2017-06-30 | Well Mode changed to Abandoned |
| 2017-06-30 | Well Type changed to Steam Assisted Gravity Drain |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 1998-03-17 | 0.00 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1998-03-23 | Slotted Liner | 538.00 | 1064.20 | 0 |
| 2017-06-18 | Packing Device Capped w/Cement | 50.00 | 58.50 | 0 |
| 2017-06-19 | Perforation | 42.00 | 44.00 | 17 |
| 2017-06-19 | Cement Squeeze | 42.00 | 44.00 | 0 |
| 2017-06-19 | Cement Plug | 29.20 | 42.00 | 0 |
| 1998-03-23 | Open Hole/Barefoot Completion | 1064.20 | 1075.00 | 0 |
| 2017-06-15 | Cement Plug | 277.90 | 375.00 | 0 |
| 2017-06-16 | Perforation | 258.00 | 260.00 | 17 |
| 2017-06-17 | Cement Squeeze | 258.00 | 260.00 | 0 |
| 2017-06-17 | Perforation | 182.00 | 184.00 | 17 |
| 2017-06-17 | Cement Squeeze | 182.00 | 184.00 | 0 |
| 2017-06-17 | Packing Device Capped w/Cement | 82.10 | 177.00 | 0 |
| 2017-06-17 | Perforation | 62.50 | 64.50 | 17 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1999 | 6312 | 0.0 | 0.0 | 0.0 |
| 2000 | 8699 | 0.0 | 0.0 | 0.0 |
| 2001 | 8480 | 0.0 | 0.0 | 0.0 |
| 2002 | 8749 | 0.0 | 0.0 | 0.0 |
| 2003 | 8125 | 0.0 | 0.0 | 0.0 |
| 2004 | 8571 | 0.0 | 0.0 | 0.0 |
| 2005 | 8421 | 0.0 | 0.0 | 0.0 |
| 2006 | 8626 | 0.0 | 0.0 | 0.0 |
| 2007 | 8555 | 0.0 | 0.0 | 0.0 |
| 2008 | 8783 | 0.0 | 0.0 | 0.0 |
| 2009 | 8518 | 0.0 | 0.0 | 0.0 |
| 2010 | 4199 | 0.0 | 0.0 | 0.0 |
| 2012 | 3428 | 0.0 | 0.0 | 0.0 |
| 2013 | 8753 | 0.0 | 0.0 | 0.0 |
| 2014 | 8234 | 0.0 | 0.0 | 0.0 |
| 2015 | 8196 | 0.0 | 0.0 | 0.0 |
| 2016 | 2215 | 0.0 | 0.0 | 0.0 |
| 2017 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2017-06-19 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]