X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0836091811002

Well Details

Well ID: 0836091811002
Loading map...
Location: 00/11-18-083-09W6/2
Location Alias: 00/11-18-83-09 W6M
Location Alias 2: 00/11-18-083-09 W6/02
Country: Canada
Province: Alberta
Township: 083
Meridian: 6
Range: 09
Section: 18
County/Municipality: Saddle Hills County
Well Name: RIGEL JOSEPHINE 11-18-83-9
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0051872
License Date: 1974-11-15
License Status: RecCertified
Spud Date: 1974-11-20
Final Drill Date: 1974-12-09
Well Total Depth: 1813.60 m
Surface Hole Latitude: 56.199191
Surface Hole Longitude: -119.416080

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1974-11-15 Obtained License
1974-12-09 Finished Drilling
1974-12-09 Well Mode changed to Drilled and Cased
1974-12-11 Production Casing Operation Performed
1974-12-17 Perforation Treatment Performed - Jet Perforation
1974-12-18 Perforation Treatment Performed - Cement Squeeze
1974-12-19 Perforation Treatment Performed - Cement Squeeze
1975-02-22 Perforation Treatment Performed - Jet Perforation
1975-02-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-03-15 Perforation Treatment Performed - Cement Squeeze
1977-10-18 Perforation Treatment Performed - Jet Perforation
2001-03-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-03-29 Plug Back Performed
2001-03-29 Well Log Performed
2001-03-31 Perforation Treatment Performed - Jet Perforation
2001-03-31 Well Log Performed
2001-03-31 Well Mode changed to Drilled and Cased
2001-04-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-04-02 Perforation Treatment Performed - Jet Perforation
2001-04-02 Plug Back Performed
2001-04-02 Well Log Performed
2001-04-02 Well Mode changed to Abandoned Zone
2001-05-16 Perforation Treatment Performed - Fractured
2001-05-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-05-18 Plug Back Performed
2001-05-18 Well Log Performed
2001-05-20 Well Abandoned
2001-05-20 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1974-12-17 Perforation 660.20 661.40 3
2001-04-02 Packing Device Capped w/Cement 1032.00 1040.00 0
2001-04-02 Perforation 676.00 678.00 14
2001-05-16 Fracture 659.00 667.00 0
2001-05-18 Packing Device Capped w/Cement 659.00 667.00 0
1974-12-18 Cement Squeeze 660.20 661.40 0
1974-12-19 Cement Squeeze 660.20 661.40 0
1975-02-22 Perforation 1755.60 1760.20 7
1975-02-25 Acid Treatment 1755.60 1760.20 0
1975-03-15 Cement Squeeze 1755.60 1760.20 0
1977-10-18 Perforation 1755.60 1760.20 7
2001-03-29 Packing Device Capped w/Cement 1707.00 1715.00 0
2001-03-31 Perforation 1046.00 1048.50 14

For data sources see[4]



References