X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0836083408000

Well Details

Well ID: 0836083408000
Loading map...
Location: 00/08-34-083-08W6/0
Location Alias: 00/08-34-83-08 W6M
Location Alias 2: 00/08-34-083-08 W6/00
Country: Canada
Province: Alberta
Township: 083
Meridian: 6
Range: 08
Section: 34
County/Municipality: Saddle Hills County
Well Name: TOURMALINE HZ CECIL 8-34-83-8
Operator Name: Tourmaline Oil Corp.
License Number: 0485873
License Date: 2017-10-17
License Status: Amended
Spud Date: 2017-11-28
Final Drill Date: 2017-12-04
Well Total Depth: 3102.00 m
Surface Hole Latitude: 56.237998
Surface Hole Longitude: -119.131763

For data sources see[1][2]

Well History

Date Event
2017-10-17 Obtained License
2017-11-28 Surface Casing Operation Performed
2017-11-29 Direction Drilling Operation Performed - Deviate
2017-11-30 Direction Drilling Operation Performed - Horizontal
2017-12-01 Intermediate Casing Operation Performed
2017-12-04 Finished Drilling
2017-12-04 Well Log Performed
2017-12-04 Well Mode changed to Drilled and Cased
2017-12-05 Liner Casing Operation Performed
2017-12-05 Rig Released
2018-03-17 Perforation Treatment Performed - Multi-Stage Fracture
2018-03-18 Perforation Treatment Performed - Multi-Stage Fracture
2018-04-01 Well Began Production
2018-04-01 Well Fluid changed to Crude Oil
2018-04-01 Well Mode changed to Pumping
2020-01-17 Perforation Treatment Performed - Cement Plug

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-11-28 Beaver Drilling Ltd. 7 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-11-29 882.70 Deviate (5 - 79 degrees)
2017-11-30 1302.20 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-03-17 Multi-Stage Fracture 3049.60 3049.70 0
2018-03-17 Multi-Stage Fracture 2617.50 2617.60 0
2018-03-17 Multi-Stage Fracture 2568.80 2568.90 0
2018-03-17 Multi-Stage Fracture 2520.00 2520.10 0
2018-03-17 Multi-Stage Fracture 2472.90 2473.00 0
2018-03-17 Multi-Stage Fracture 2424.20 2424.30 0
2018-03-17 Multi-Stage Fracture 2375.70 2375.80 0
2018-03-17 Multi-Stage Fracture 2327.30 2327.40 0
2018-03-17 Multi-Stage Fracture 2279.50 2279.60 0
2018-03-17 Multi-Stage Fracture 2231.00 2231.10 0
2018-03-17 Multi-Stage Fracture 2182.80 2182.90 0
2018-03-17 Multi-Stage Fracture 3000.80 3000.90 0
2018-03-17 Multi-Stage Fracture 2134.90 2135.00 0
2018-03-17 Multi-Stage Fracture 2086.20 2086.30 0
2018-03-17 Multi-Stage Fracture 2037.50 2037.60 0
2018-03-17 Multi-Stage Fracture 1989.00 1989.10 0
2018-03-17 Multi-Stage Fracture 1940.90 1941.00 0
2018-03-17 Multi-Stage Fracture 1892.30 1892.40 0
2018-03-17 Multi-Stage Fracture 1844.40 1844.50 0
2018-03-18 Multi-Stage Fracture 1796.60 1796.70 0
2018-03-18 Multi-Stage Fracture 1748.30 1748.40 0
2018-03-18 Multi-Stage Fracture 1700.20 1700.30 0
2018-03-17 Multi-Stage Fracture 2953.20 2953.30 0
2018-03-18 Multi-Stage Fracture 1651.40 1651.50 0
2018-03-18 Multi-Stage Fracture 1603.50 1603.60 0
2018-03-18 Multi-Stage Fracture 1556.20 1556.30 0
2018-03-18 Multi-Stage Fracture 1507.50 1507.60 0
2018-03-18 Multi-Stage Fracture 1459.70 1459.80 0
2018-03-18 Multi-Stage Fracture 1411.50 1411.60 0
2020-01-17 Cement Plug 1155.00 1287.00 0
2018-03-17 Multi-Stage Fracture 2904.40 2904.50 0
2018-03-17 Multi-Stage Fracture 2857.10 2857.20 0
2018-03-17 Multi-Stage Fracture 2809.00 2809.10 0
2018-03-17 Multi-Stage Fracture 2760.50 2760.60 0
2018-03-17 Multi-Stage Fracture 2713.40 2713.50 0
2018-03-17 Multi-Stage Fracture 2664.70 2664.80 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-03-17 2018-03-18 1,148 2,988 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 86.8137 N/A
20/40 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 5.987 N/A
20/40 SiberProp Calfrac Quartz 14808-60-7 100 4.9351 N/A
50/140 Sand (Domestic) Calfrac Crystalline silica (Quartz) 14808-60-7 100 2.0153 N/A
DWP-944 Calfrac Bactericide/Biocide Acetamide. 2.2-dibromo-2-cyano 10222-01-2 100 0.0114 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0114 N/A
DWP-913 Calfrac Clay Control Non-Hazardous Ingredients Trade Secret 100 0.0913 N/A
DWP-959 Calfrac Demulsifier Methanol 67-56-1 100 0.0803 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0803 N/A
DWP-621 Calfrac Friction Reducer Non-Hazardous Ingredients Trade Secret 100 0.0654 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-03-17 2018-03-18 Surface Water - Runoff 2988

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 6133 0.0 0.0 0.0
2019 4564 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-12-04 No Incident Encountered 0.00 0.00
2018-03-18 No Incident Encountered 0.00 0.00
2020-01-20 No Incident Encountered 0.00 0.00

For data sources see[10]

References