If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0836083314000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.228707,"lon":-119.199154,"icon":""}]} |
Location: 00/14-33-083-08W6/0 | |
Location Alias: 00/14-33-83-08 W6M | |
Location Alias 2: 00/14-33-083-08 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 083 | |
Meridian: 6 | |
Range: 08 | |
Section: 33 | |
County/Municipality: Saddle Hills County | |
Well Name: TOURMALINE EARRING 14-33-83-8 | |
Operator Name: Tourmaline Oil Corp. | |
License Number: 0447063 | |
License Date: 2012-07-10 | |
License Status: Suspension | |
Spud Date: 2012-07-27 | |
Final Drill Date: 2012-08-09 | |
Well Total Depth: 2794.00 m | |
Surface Hole Latitude: 56.228707 | |
Surface Hole Longitude: -119.199154 |
Date | Event |
---|---|
2012-07-10 | Obtained License |
2012-07-28 | Surface Casing Operation Performed |
2012-07-29 | Direction Drilling Operation Performed - Deviate |
2012-08-01 | Direction Drilling Operation Performed - Horizontal |
2012-08-03 | Intermediate Casing Operation Performed |
2012-08-03 | Well Log Performed |
2012-08-09 | Finished Drilling |
2012-08-09 | Well Log Performed |
2012-08-09 | Well Mode changed to Drilled and Cased |
2012-08-11 | Liner Casing Operation Performed |
2012-08-11 | Perforation Treatment Performed - Open-Hole Completion |
2012-08-12 | Rig Released |
2012-08-21 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-08-22 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-08-23 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-11-26 | Well Began Production |
2012-11-26 | Well Fluid changed to Crude Oil |
2012-11-26 | Well Mode changed to Pumping |
2019-05-01 | Well Fluid changed to Crude Oil |
2019-05-01 | Well Mode changed to Suspended |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-07-27 | Trinidad Drilling Ltd. | 24 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-07-29 | 528.50 | Deviate (5 - 79 degrees) |
2012-08-01 | 1397.20 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-08-11 | Open Hole/Barefoot Completion | 2791.00 | 2794.00 | 0 |
2012-08-23 | Multi-Stage Fracture | 2254.10 | 2254.20 | 0 |
2012-08-23 | Multi-Stage Fracture | 2184.20 | 2184.30 | 0 |
2012-08-23 | Multi-Stage Fracture | 2126.90 | 2127.00 | 0 |
2012-08-23 | Multi-Stage Fracture | 2057.10 | 2057.20 | 0 |
2012-08-23 | Multi-Stage Fracture | 1999.80 | 1999.90 | 0 |
2012-08-23 | Multi-Stage Fracture | 1929.80 | 1929.90 | 0 |
2012-08-23 | Multi-Stage Fracture | 1872.70 | 1872.80 | 0 |
2012-08-23 | Multi-Stage Fracture | 1802.70 | 1802.80 | 0 |
2012-08-23 | Multi-Stage Fracture | 1733.00 | 1733.10 | 0 |
2012-08-23 | Multi-Stage Fracture | 1675.80 | 1675.90 | 0 |
2012-08-21 | Multi-Stage Fracture | 2764.00 | 2764.10 | 0 |
2012-08-23 | Multi-Stage Fracture | 1605.90 | 1606.00 | 0 |
2012-08-23 | Multi-Stage Fracture | 1548.50 | 1548.60 | 0 |
2012-08-21 | Multi-Stage Fracture | 2693.80 | 2693.90 | 0 |
2012-08-21 | Multi-Stage Fracture | 2636.60 | 2636.70 | 0 |
2012-08-21 | Multi-Stage Fracture | 2566.70 | 2566.80 | 0 |
2012-08-22 | Multi-Stage Fracture | 2496.70 | 2496.80 | 0 |
2012-08-23 | Multi-Stage Fracture | 2438.50 | 2438.60 | 0 |
2012-08-23 | Multi-Stage Fracture | 2381.40 | 2381.50 | 0 |
2012-08-23 | Multi-Stage Fracture | 2311.40 | 2311.50 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 682 | 0.0 | 0.0 | 0.0 |
2013 | 8261 | 0.0 | 0.0 | 0.0 |
2014 | 5739 | 0.0 | 0.0 | 0.0 |
2015 | 333 | 0.0 | 0.0 | 0.0 |
2016 | 8269 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-08-11 | No Incident Encountered | 0.00 | 0.00 |
2012-08-23 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]