If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0836083205020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.221455,"lon":-119.231802,"icon":""}]} |
Location: 02/05-32-083-08W6/0 | |
Location Alias: 02/05-32-83-08 W6M | |
Location Alias 2: 02/05-32-083-08 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 083 | |
Meridian: 6 | |
Range: 08 | |
Section: 32 | |
County/Municipality: Saddle Hills County | |
Well Name: TOURMALINE HZ 102 CECIL 5-32-83-8 | |
Operator Name: Tourmaline Oil Corp. | |
License Number: 0489663 | |
License Date: 2018-06-21 | |
License Status: Amended | |
Spud Date: 2018-10-05 | |
Final Drill Date: 2018-10-11 | |
Well Total Depth: 2878.00 m | |
Surface Hole Latitude: 56.221455 | |
Surface Hole Longitude: -119.231802 |
Date | Event |
---|---|
2018-06-21 | Obtained License |
2018-10-06 | Surface Casing Operation Performed |
2018-10-07 | Direction Drilling Operation Performed - Deviate |
2018-10-08 | Direction Drilling Operation Performed - Horizontal |
2018-10-09 | Intermediate Casing Operation Performed |
2018-10-11 | Finished Drilling |
2018-10-11 | Well Log Performed |
2018-10-11 | Well Mode changed to Drilled and Cased |
2018-10-12 | Liner Casing Operation Performed |
2018-10-12 | Rig Released |
2018-10-25 | Well Log Performed |
2018-10-30 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-11-01 | Well Log Performed |
2018-12-01 | Well Began Production |
2018-12-01 | Well Fluid changed to Crude Oil |
2018-12-01 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2018-10-05 | Beaver Drilling Ltd. | 7 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2018-10-07 | 872.90 | Deviate (5 - 79 degrees) |
2018-10-08 | 1292.90 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2018-10-30 | Multi-Stage Fracture | 2861.00 | 2861.10 | 0 |
2018-10-30 | Multi-Stage Fracture | 2315.50 | 2315.60 | 0 |
2018-10-30 | Multi-Stage Fracture | 2256.30 | 2256.40 | 0 |
2018-10-30 | Multi-Stage Fracture | 2197.70 | 2197.80 | 0 |
2018-10-30 | Multi-Stage Fracture | 2139.10 | 2139.20 | 0 |
2018-10-30 | Multi-Stage Fracture | 2080.40 | 2080.50 | 0 |
2018-10-30 | Multi-Stage Fracture | 2021.40 | 2021.50 | 0 |
2018-10-30 | Multi-Stage Fracture | 1962.40 | 1962.50 | 0 |
2018-10-30 | Multi-Stage Fracture | 1903.60 | 1903.70 | 0 |
2018-10-30 | Multi-Stage Fracture | 1844.60 | 1844.70 | 0 |
2018-10-30 | Multi-Stage Fracture | 1785.80 | 1785.90 | 0 |
2018-10-30 | Multi-Stage Fracture | 2787.00 | 2787.10 | 0 |
2018-10-30 | Multi-Stage Fracture | 1726.70 | 1726.80 | 0 |
2018-10-30 | Multi-Stage Fracture | 1667.90 | 1668.00 | 0 |
2018-10-30 | Multi-Stage Fracture | 1609.00 | 1609.10 | 0 |
2018-10-30 | Multi-Stage Fracture | 1550.60 | 1550.70 | 0 |
2018-10-30 | Multi-Stage Fracture | 1491.50 | 1491.60 | 0 |
2018-10-30 | Multi-Stage Fracture | 1432.90 | 1433.00 | 0 |
2018-10-30 | Multi-Stage Fracture | 2727.80 | 2727.90 | 0 |
2018-10-30 | Multi-Stage Fracture | 2668.90 | 2669.00 | 0 |
2018-10-30 | Multi-Stage Fracture | 2610.20 | 2610.30 | 0 |
2018-10-30 | Multi-Stage Fracture | 2551.20 | 2551.30 | 0 |
2018-10-30 | Multi-Stage Fracture | 2492.10 | 2492.20 | 0 |
2018-10-30 | Multi-Stage Fracture | 2433.10 | 2433.20 | 0 |
2018-10-30 | Multi-Stage Fracture | 2374.70 | 2374.80 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-10-30 | 2018-10-30 | 1,145 | 3,766 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | water | Not Available | 100 | 87.8207 | N/A | |||
Sand 20/40 | Trican | silica crystalline | 14808-60-7 | 100 | 10.8153 | N/A | ||
Sand 50/140 | Trican | silica crystalline | 14808-60-7 | 100 | 1.1954 | N/A | ||
WBO-2 | Trican | Breaker | sodium persulfate | 7775-27-1 | 100 | 0.0151 | N/A | |
FR-23 | Trican | Friction Reducer | acrylamide modified polymer | 9972 | 100 | 0.0751 | N/A | |
distillates (petroleum). hydrotreated light | 64742-47-8 | 100 | 0.0751 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0751 | N/A | ||||
PFC-3 | Trican | Surfactant | aminofunctional polymer | 10352 | 100 | 0.0451 | N/A | |
glycol ether | 10352 | 100 | 0.0451 | N/A | ||||
petroleum distillates | 10352 | 100 | 0.0451 | N/A | ||||
silicon compound | 10352 | 100 | 0.0451 | N/A | ||||
S-17X | Trican | Surfactant | 1-hexanol. 2-ethyl-. manuf. of. by-products from. distn. residues |
68609-68-7 | 100 | 0.0329 | N/A | |
benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol | 26836-07-7 | 100 | 0.0329 | N/A | ||||
methanol | 67-56-1 | 100 | 0.0329 | N/A | ||||
methyloxirane polymer with oxirane | 11/6/9003 | 100 | 0.0329 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0329 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2018-10-30 | 2018-10-31 | Surface Water - Runoff | 2765 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2018 | 687 | 0.0 | 0.0 | 0.0 |
2019 | 6613 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-10-11 | No Incident Encountered | 0.00 | 0.00 |
2018-11-06 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]