If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0836082311000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.207987,"lon":-119.118172,"icon":""}]} |
Location: 00/11-23-083-08W6/0 | |
Location Alias: 00/11-23-83-08 W6M | |
Location Alias 2: 00/11-23-083-08 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 083 | |
Meridian: 6 | |
Range: 08 | |
Section: 23 | |
County/Municipality: Saddle Hills County | |
Well Name: TOURMALINE HZ EARRING 11-23-83-8 | |
Operator Name: Tourmaline Oil Corp. | |
License Number: 0483757 | |
License Date: 2017-05-30 | |
License Status: Issued | |
Spud Date: 2017-07-24 | |
Final Drill Date: 2017-08-01 | |
Well Total Depth: 3333.00 m | |
Surface Hole Latitude: 56.207987 | |
Surface Hole Longitude: -119.118172 |
Date | Event |
---|---|
2017-05-30 | Obtained License |
2017-07-25 | Surface Casing Operation Performed |
2017-07-26 | Direction Drilling Operation Performed - Deviate |
2017-07-27 | Direction Drilling Operation Performed - Horizontal |
2017-07-28 | Intermediate Casing Operation Performed |
2017-08-01 | Finished Drilling |
2017-08-01 | Well Log Performed |
2017-08-01 | Well Mode changed to Drilled and Cased |
2017-08-02 | Liner Casing Operation Performed |
2017-08-03 | Rig Released |
2017-09-02 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-09-12 | Well Fluid changed to Crude Oil |
2017-09-12 | Well Mode changed to Drilling and Completing |
2017-10-31 | Well Began Production |
2017-10-31 | Well Fluid changed to Crude Oil |
2017-10-31 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2017-07-24 | Beaver Drilling Ltd. | 7 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2017-07-26 | 882.90 | Deviate (5 - 79 degrees) |
2017-07-27 | 1343.50 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2017-09-02 | Multi-Stage Fracture | 3283.40 | 3285.30 | 0 |
2017-09-02 | Multi-Stage Fracture | 2613.90 | 2615.80 | 0 |
2017-09-02 | Multi-Stage Fracture | 2539.80 | 2541.70 | 0 |
2017-09-02 | Multi-Stage Fracture | 2465.70 | 2467.60 | 0 |
2017-09-02 | Multi-Stage Fracture | 2391.30 | 2393.20 | 0 |
2017-09-02 | Multi-Stage Fracture | 2316.80 | 2318.80 | 0 |
2017-09-02 | Multi-Stage Fracture | 2242.10 | 2244.00 | 0 |
2017-09-02 | Multi-Stage Fracture | 1869.10 | 1871.00 | 0 |
2017-09-02 | Multi-Stage Fracture | 1793.80 | 1795.70 | 0 |
2017-09-02 | Multi-Stage Fracture | 1719.50 | 1721.40 | 0 |
2017-09-02 | Multi-Stage Fracture | 1644.50 | 1646.40 | 0 |
2017-09-02 | Multi-Stage Fracture | 3208.30 | 3210.20 | 0 |
2017-09-02 | Multi-Stage Fracture | 1569.30 | 1571.20 | 0 |
2017-09-02 | Multi-Stage Fracture | 1494.70 | 1496.60 | 0 |
2017-09-02 | Multi-Stage Fracture | 1419.60 | 1421.60 | 0 |
2017-09-02 | Multi-Stage Fracture | 3133.30 | 3135.20 | 0 |
2017-09-02 | Multi-Stage Fracture | 3058.60 | 3060.50 | 0 |
2017-09-02 | Multi-Stage Fracture | 2983.50 | 2985.40 | 0 |
2017-09-02 | Multi-Stage Fracture | 2910.00 | 2911.90 | 0 |
2017-09-02 | Multi-Stage Fracture | 2836.70 | 2838.60 | 0 |
2017-09-02 | Multi-Stage Fracture | 2762.40 | 2764.30 | 0 |
2017-09-02 | Multi-Stage Fracture | 2688.50 | 2690.40 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2017-09-02 | 2017-09-02 | 1,172 | 1,230 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | N2 | 7727-37-9 | 100 | 1.3623 | N/A | |||
water | Not Available | 100 | 89.3545 | N/A | ||||
Sand 30/50 | Trican | silica crystalline | 14808-60-7 | 100 | 9.0588 | N/A | ||
Tolcide PS75LT | Trican | Bactericide/Biocide | tetrakis(hydroxymethyl)phosphonium sulphate | 55566-30-8 | 100 | 0.0124 | N/A | |
water | Not Available | 100 | 0.0124 | N/A | ||||
CAN-1912 Clay Stabilizer | Trican | Clay Control | non-hazardous ingredients | Not Available | 100 | 0.096 | N/A | |
CAN-2057 Friction Reducer | Trican | Friction Reducer | acrylamide modified polymer | 9972 | 100 | 0.0478 | N/A | |
distillates (petroleum). hydrotreated light | 64742-47-8 | 100 | 0.0478 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0478 | N/A | ||||
CAN-2412 Non-emulsifier | Trican | Surfactant | 1-hexanol. 2-ethyl-. manuf. of. by-products from. distn. residues |
68609-68-7 | 100 | 0.039 | N/A | |
benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol | 26836-07-7 | 100 | 0.039 | N/A | ||||
methanol | 67-56-1 | 100 | 0.039 | N/A | ||||
methyloxirane polymer with oxirane | 11/6/9003 | 100 | 0.039 | N/A | ||||
water | Not Available | 100 | 0.039 | N/A | ||||
SS-9 | Trican | Surfactant | aminofunctional polymer | 10840 | 100 | 0.0289 | N/A | |
glycol ether | 10840 | 100 | 0.0289 | N/A | ||||
petroleum distillates | 10840 | 100 | 0.0289 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2017-09-03 | 2017-09-04 | Surface Water - Runoff | 1140 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2017 | 971 | 0.0 | 0.0 | 0.0 |
2018 | 6175 | 0.0 | 0.0 | 0.0 |
2019 | 767 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2017-08-01 | No Incident Encountered | 0.00 | 0.00 |
2017-09-15 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]