If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0836082102000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.193116,"lon":-119.166683,"icon":""}]} |
Location: 00/02-21-083-08W6/0 | |
Location Alias: 00/02-21-83-08 W6M | |
Location Alias 2: 00/02-21-083-08 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 083 | |
Meridian: 6 | |
Range: 08 | |
Section: 21 | |
County/Municipality: Saddle Hills County | |
Well Name: TOURMALINE HZ CECIL 2-21-83-8 | |
Operator Name: Tourmaline Oil Corp. | |
License Number: 0485288 | |
License Date: 2017-09-06 | |
License Status: Issued | |
Spud Date: 2017-10-08 | |
Final Drill Date: 2017-10-14 | |
Well Total Depth: 3285.00 m | |
Surface Hole Latitude: 56.193116 | |
Surface Hole Longitude: -119.166683 |
Date | Event |
---|---|
2017-09-06 | Obtained License |
2017-10-09 | Surface Casing Operation Performed |
2017-10-10 | Direction Drilling Operation Performed - Deviate |
2017-10-11 | Direction Drilling Operation Performed - Horizontal |
2017-10-12 | Intermediate Casing Operation Performed |
2017-10-14 | Finished Drilling |
2017-10-14 | Well Log Performed |
2017-10-14 | Well Mode changed to Drilled and Cased |
2017-10-15 | Liner Casing Operation Performed |
2017-10-16 | Rig Released |
2017-11-12 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-12-09 | Well Began Production |
2017-12-09 | Well Fluid changed to Crude Oil |
2017-12-09 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2017-10-08 | Precision Drilling Corporation | 533 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2017-10-10 | 871.30 | Deviate (5 - 79 degrees) |
2017-10-11 | 1307.80 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2017-11-12 | Multi-Stage Fracture | 3254.00 | 3254.10 | 0 |
2017-11-12 | Multi-Stage Fracture | 2600.90 | 2601.00 | 0 |
2017-11-12 | Multi-Stage Fracture | 2528.00 | 2528.10 | 0 |
2017-11-12 | Multi-Stage Fracture | 2455.80 | 2455.90 | 0 |
2017-11-12 | Multi-Stage Fracture | 2383.80 | 2383.90 | 0 |
2017-11-12 | Multi-Stage Fracture | 2311.30 | 2311.40 | 0 |
2017-11-12 | Multi-Stage Fracture | 2238.90 | 2239.00 | 0 |
2017-11-12 | Multi-Stage Fracture | 2167.30 | 2167.40 | 0 |
2017-11-12 | Multi-Stage Fracture | 2094.80 | 2094.90 | 0 |
2017-11-12 | Multi-Stage Fracture | 2021.90 | 2022.00 | 0 |
2017-11-12 | Multi-Stage Fracture | 1949.30 | 1949.40 | 0 |
2017-11-12 | Multi-Stage Fracture | 3182.00 | 3182.10 | 0 |
2017-11-12 | Multi-Stage Fracture | 1876.50 | 1876.60 | 0 |
2017-11-12 | Multi-Stage Fracture | 1804.30 | 1804.40 | 0 |
2017-11-12 | Multi-Stage Fracture | 1732.30 | 1732.40 | 0 |
2017-11-12 | Multi-Stage Fracture | 1660.60 | 1660.70 | 0 |
2017-11-12 | Multi-Stage Fracture | 1587.70 | 1587.80 | 0 |
2017-11-12 | Multi-Stage Fracture | 1515.00 | 1515.10 | 0 |
2017-11-12 | Multi-Stage Fracture | 1456.40 | 1456.50 | 0 |
2017-11-12 | Multi-Stage Fracture | 3109.50 | 3109.60 | 0 |
2017-11-12 | Multi-Stage Fracture | 3036.60 | 3036.70 | 0 |
2017-11-12 | Multi-Stage Fracture | 2964.30 | 2964.40 | 0 |
2017-11-12 | Multi-Stage Fracture | 2891.80 | 2891.90 | 0 |
2017-11-12 | Multi-Stage Fracture | 2819.50 | 2819.60 | 0 |
2017-11-12 | Multi-Stage Fracture | 2746.60 | 2746.70 | 0 |
2017-11-12 | Multi-Stage Fracture | 2674.00 | 2674.10 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2017-11-12 | 2017-11-12 | 1,169 | 3,727 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 90.5755 | N/A | |||
Sand - Tier 1 (20/40) | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 5.4834 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 5.4834 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 5.4834 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 5.4834 | N/A | ||||
Sand - Tier 2 (50/140) | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 1.1425 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 1.1425 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 1.1425 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 1.1426 | N/A | ||||
SiberProp (20/40) | Canyon Technical Services | Crystalline silica. quartz | 14808-60-7 | 100 | 4.1558 | N/A | ||
Phenol formaldehyde resin | 9003-35-4 | 100 | 4.1558 | N/A | ||||
AQUCAR DB20 Biocide | Trican Well Service | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0132 | N/A | |
2-mercaptoethanol | 60-24-2 | 100 | 0.0132 | N/A | ||||
dibromoacetonitrile | 3252-43-5 | 100 | 0.0132 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0132 | N/A | ||||
sodium bromide | 7647-15-6 | 100 | 0.0132 | N/A | ||||
CC-8 Clay Stabilizer | Trican Well Service | Clay Control | choline chloride | 67-48-1 | 100 | 0.1023 | N/A | |
non-hazardous ingredients | Not Available | 100 | 0.1023 | N/A | ||||
CAN-2412 Non-emulsifier | Canyon Technical Services | Demulsifier | 1-Hexanol. 2-ethyl-. manuf. of. by-products from. distn. residues |
68609-68-7 | 100 | 0.0893 | N/A | |
Benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol (1:1) |
26836-07-7 | 100 | 0.0893 | N/A | ||||
Methanol | 67-56-1 | 100 | 0.0893 | N/A | ||||
Poly(oxyethelyne. oxypropylene) copolymer. liquids | 11/6/9003 | 100 | 0.0893 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0893 | N/A | ||||
CAN-2057 Friction Reducer | Canyon Technical Services | Gelling Agent | No hazardous ingredients | Not Available | 100 | 0.0512 | N/A | |
SI-18 (Scale Inhibitor) | Trican Well Service | Scale Inhibitor | non-hazardous ingredients | Not Available | 100 | 0.0451 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2017-11-12 | 2017-11-13 | Surface Water - Runoff | 3726 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2017 | 525 | 0.0 | 0.0 | 0.0 |
2018 | 8560 | 0.0 | 0.0 | 0.0 |
2019 | 8628 | 0.0 | 0.0 | 0.0 |
2020 | 1503 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2017-10-14 | No Incident Encountered | 0.00 | 0.00 |
2017-11-26 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]