If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0836082004000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.221455,"lon":-119.231662,"icon":""}]} |
Location: 00/04-20-083-08W6/0 | |
Location Alias: 00/04-20-83-08 W6M | |
Location Alias 2: 00/04-20-083-08 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 083 | |
Meridian: 6 | |
Range: 08 | |
Section: 20 | |
County/Municipality: Saddle Hills County | |
Well Name: TOURMALINE 100 CECIL 4-20-83-8 | |
Operator Name: Tourmaline Oil Corp. | |
License Number: 0489661 | |
License Date: 2018-06-21 | |
License Status: Amended | |
Spud Date: 2018-10-13 | |
Final Drill Date: 2018-10-19 | |
Well Total Depth: 2892.00 m | |
Surface Hole Latitude: 56.221455 | |
Surface Hole Longitude: -119.231662 |
Date | Event |
---|---|
2018-06-21 | Obtained License |
2018-10-14 | Surface Casing Operation Performed |
2018-10-15 | Direction Drilling Operation Performed - Deviate |
2018-10-16 | Direction Drilling Operation Performed - Horizontal |
2018-10-17 | Intermediate Casing Operation Performed |
2018-10-19 | Finished Drilling |
2018-10-19 | Well Log Performed |
2018-10-19 | Well Mode changed to Drilled and Cased |
2018-10-20 | Liner Casing Operation Performed |
2018-10-20 | Rig Released |
2018-10-30 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-12-01 | Well Began Production |
2018-12-01 | Well Fluid changed to Crude Oil |
2018-12-01 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2018-10-13 | Beaver Drilling Ltd. | 7 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2018-10-15 | 863.30 | Deviate (5 - 79 degrees) |
2018-10-16 | 1274.20 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2018-10-30 | Multi-Stage Fracture | 2811.20 | 2811.30 | 0 |
2018-10-30 | Multi-Stage Fracture | 2281.90 | 2282.00 | 0 |
2018-10-30 | Multi-Stage Fracture | 2223.30 | 2223.40 | 0 |
2018-10-30 | Multi-Stage Fracture | 2164.10 | 2164.20 | 0 |
2018-10-30 | Multi-Stage Fracture | 2107.20 | 2107.30 | 0 |
2018-10-30 | Multi-Stage Fracture | 2050.00 | 2050.10 | 0 |
2018-10-30 | Multi-Stage Fracture | 1992.50 | 1992.60 | 0 |
2018-10-30 | Multi-Stage Fracture | 1936.20 | 1936.30 | 0 |
2018-10-30 | Multi-Stage Fracture | 1879.20 | 1879.30 | 0 |
2018-10-30 | Multi-Stage Fracture | 1822.10 | 1822.20 | 0 |
2018-10-30 | Multi-Stage Fracture | 1764.90 | 1765.00 | 0 |
2018-10-30 | Multi-Stage Fracture | 2752.00 | 2752.10 | 0 |
2018-10-30 | Multi-Stage Fracture | 1705.80 | 1705.90 | 0 |
2018-10-30 | Multi-Stage Fracture | 1648.00 | 1648.10 | 0 |
2018-10-30 | Multi-Stage Fracture | 1589.90 | 1590.00 | 0 |
2018-10-30 | Multi-Stage Fracture | 1532.20 | 1532.30 | 0 |
2018-10-30 | Multi-Stage Fracture | 1474.20 | 1474.30 | 0 |
2018-10-30 | Multi-Stage Fracture | 1416.10 | 1416.20 | 0 |
2018-10-30 | Multi-Stage Fracture | 2692.90 | 2693.00 | 0 |
2018-10-30 | Multi-Stage Fracture | 2634.90 | 2635.00 | 0 |
2018-10-30 | Multi-Stage Fracture | 2575.90 | 2576.00 | 0 |
2018-10-30 | Multi-Stage Fracture | 2516.80 | 2516.90 | 0 |
2018-10-30 | Multi-Stage Fracture | 2457.80 | 2457.90 | 0 |
2018-10-30 | Multi-Stage Fracture | 2399.20 | 2399.30 | 0 |
2018-10-30 | Multi-Stage Fracture | 2340.80 | 2340.90 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-10-30 | 2018-10-30 | 1,151 | 3,708 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | water | Not Available | 100 | 87.4796 | N/A | |||
Sand 20/40 | Trican | silica crystalline | 14808-60-7 | 100 | 11.1581 | N/A | ||
Sand 50/140 | Trican | silica crystalline | 14808-60-7 | 100 | 1.1925 | N/A | ||
WBO-2 | Trican | Breaker | sodium persulfate | 7775-27-1 | 100 | 0.013 | N/A | |
FR-23 | Trican | Friction Reducer | acrylamide modified polymer | 9972 | 100 | 0.0767 | N/A | |
distillates (petroleum). hydrotreated light | 64742-47-8 | 100 | 0.0767 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0767 | N/A | ||||
PFC-3 | Trican | Surfactant | aminofunctional polymer | 10352 | 100 | 0.0436 | N/A | |
glycol ether | 10352 | 100 | 0.0436 | N/A | ||||
petroleum distillates | 10352 | 100 | 0.0436 | N/A | ||||
silicon compound | 10352 | 100 | 0.0436 | N/A | ||||
S-17X | Trican | Surfactant | 1-hexanol. 2-ethyl-. manuf. of. by-products from. distn. residues |
68609-68-7 | 100 | 0.0362 | N/A | |
benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol | 26836-07-7 | 100 | 0.0362 | N/A | ||||
methanol | 67-56-1 | 100 | 0.0362 | N/A | ||||
methyloxirane polymer with oxirane | 11/6/9003 | 100 | 0.0362 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0362 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2018-10-30 | 2018-10-31 | Surface Water - Runoff | 3708 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2018 | 726 | 0.0 | 0.0 | 0.0 |
2019 | 8148 | 0.0 | 0.0 | 0.0 |
2020 | 2075 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-10-19 | No Incident Encountered | 0.00 | 0.00 |
2018-11-04 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]