X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0836073205000

Well Details

Well ID: 0836073205000
Loading map...
Location: 00/05-32-083-07W6/0
Location Alias: 00/05-32-83-07 W6M
Location Alias 2: 00/05-32-083-07 W6/00
Country: Canada
Province: Alberta
Township: 083
Meridian: 6
Range: 07
Section: 32
County/Municipality: Saddle Hills County
Well Name: COMPTON ET AL 16-31 CECIL 5-32-83-7
Operator Name: Harvest Operations Corp.
License Number: 0189224
License Date: 1996-07-03
License Status: Amended
Spud Date: 1996-07-30
Final Drill Date: 1996-08-20
Well Total Depth: 1961.00 m
Surface Hole Latitude: 56.246789
Surface Hole Longitude: -119.084199

For data sources see[1][2]

Well History

Date Event
1996-07-03 Obtained License
1996-07-30 Lost Circulation Occurred
1996-07-30 Well Log Performed
1996-08-02 Surface Casing Operation Performed
1996-08-08 Direction Drilling Operation Performed - Horizontal
1996-08-14 Intermediate Casing Operation Performed
1996-08-15 Liner Casing Operation Performed
1996-08-20 Finished Drilling
1996-08-20 Perforation Treatment Performed - Open-Hole Completion
1996-08-20 Well Mode changed to Drilled and Cased
1996-08-21 Rig Released
1996-08-22 Well Log Performed
1996-09-07 Well Log Performed
1996-09-12 Well Began Production
1996-09-12 Well Fluid changed to Crude Oil
1996-09-12 Well Mode changed to Flowing
1996-11-12 Well Fluid changed to Crude Oil
1996-11-12 Well Mode changed to Pumping
2006-03-28 Well Log Performed
2006-03-30 Well Log Performed
2006-04-27 Well Began Injection
2006-04-27 Well Fluid changed to Water
2006-04-27 Well Type changed to Disposal
2011-03-07 Perforation Treatment Performed - Acid Squeeze - Press Used
2013-01-14 Perforation Treatment Performed - Acid Squeeze - Press Used
2013-10-18 Perforation Treatment Performed - Acid Squeeze - Press Used
2015-02-05 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1996-08-08 929.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-08-20 Open Hole/Barefoot Completion 1217.50 1961.00 0
2011-03-07 Acid Treatment 1217.50 1961.00 0
2013-01-14 Acid Treatment 1217.50 1961.00 0
2013-10-18 Acid Treatment 1217.50 1961.00 0
2015-02-05 Acid Treatment 1217.50 1961.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 1452 0.0 0.0 0.0
1997 7448 0.0 0.0 0.0
1998 8015 0.0 0.0 0.0
1999 8280 0.0 0.0 0.0
2000 8530 0.0 0.0 0.0
2001 8422 0.0 0.0 0.0
2002 8636 0.0 0.0 0.0
2003 8225 0.0 0.0 0.0
2004 8364 0.0 0.0 0.0
2005 8319 0.0 0.0 0.0
2006 1524 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1996-07-30 Lost Circulation 24.00 258.00
2013-01-15 No Incident Encountered 0.00 0.00
2013-10-20 No Incident Encountered 0.00 0.00
2014-07-24 No Incident Encountered 0.00 0.00
2015-02-05 No Incident Encountered 0.00 0.00

For data sources see[7]

References