X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0836072808000

Well Details

Well ID: 0836072808000
Loading map...
Location: 00/08-28-083-07W6/0
Location Alias: 00/08-28-83-07 W6M
Location Alias 2: 00/08-28-083-07 W6/00
Country: Canada
Province: Alberta
Township: 083
Meridian: 6
Range: 07
Section: 28
County/Municipality: Saddle Hills County
Well Name: TOURMALINE ROYCE 8-28-83-7
Operator Name: Tourmaline Oil Corp.
License Number: 0343176
License Date: 2005-11-22
License Status: Suspension
Spud Date: 2005-12-07
Final Drill Date: 2005-12-21
Well Total Depth: 2237.00 m
Surface Hole Latitude: 56.225493
Surface Hole Longitude: -119.031973

For data sources see[1][2]

Well History

Date Event
2005-11-22 Obtained License
2005-12-09 Surface Casing Operation Performed
2005-12-21 Finished Drilling
2005-12-21 Well Log Performed
2005-12-21 Well Mode changed to Drilled and Cased
2005-12-23 Drill Stem Test Performed
2005-12-24 Production Casing Operation Performed
2005-12-24 Rig Released
2006-01-18 Well Log Performed
2006-01-22 Perforation Treatment Performed - Jet Perforation
2006-01-22 Well Log Performed
2006-01-25 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-02-12 Well Log Performed
2006-02-14 Perforation Treatment Performed - Jet Perforation
2006-02-22 Well Log Performed
2006-02-23 Perforation Treatment Performed - Jet Perforation
2006-02-24 Well Log Performed
2006-02-25 Perforation Treatment Performed - Jet Perforation
2006-02-25 Well Log Performed
2006-03-03 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-04-23 Well Began Production
2006-04-23 Well Fluid changed to Gas
2006-04-23 Well Mode changed to Flowing
2006-10-01 Well Structure changed to Commingled
2020-01-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-01-28 Well Log Performed
2020-01-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-01-31 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-01-22 Perforation 2208.00 2210.00 17
2006-03-03 Acid Treatment 2199.00 2200.50 0
2020-01-28 Packing Device Capped w/Cement 2202.00 2205.00 0
2020-01-29 Packing Device Capped w/Cement 2170.00 2178.00 0
2006-01-22 Perforation 2212.00 2216.00 17
2006-01-25 Acid Treatment 2208.00 2210.00 0
2006-01-25 Acid Treatment 2212.00 2216.00 0
2006-02-14 Perforation 2187.50 2193.00 17
2006-02-23 Perforation 2192.50 2197.00 17
2006-02-25 Perforation 2199.00 2200.50 17
2006-03-03 Acid Treatment 2187.50 2193.00 0
2006-03-03 Acid Treatment 2192.50 2197.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 2775 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2020-01-30 No Incident Encountered 0.00 0.00

For data sources see[6]

References