X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0836071909000

Well Details

Well ID: 0836071909000
Loading map...
Location: 00/09-19-083-07W6/0
Location Alias: 00/09-19-83-07 W6M
Location Alias 2: 00/09-19-083-07 W6/00
Country: Canada
Province: Alberta
Township: 083
Meridian: 6
Range: 07
Section: 19
County/Municipality: Saddle Hills County
Well Name: TOURMALINE HZ CECIL 9-19-83-7
Operator Name: Tourmaline Oil Corp.
License Number: 0485432
License Date: 2017-09-14
License Status: Issued
Spud Date: 2017-09-24
Final Drill Date: 2017-10-01
Well Total Depth: 3220.00 m
Surface Hole Latitude: 56.208595
Surface Hole Longitude: -119.118503

For data sources see[1][2]

Well History

Date Event
2017-09-14 Obtained License
2017-09-25 Surface Casing Operation Performed
2017-09-26 Direction Drilling Operation Performed - Deviate
2017-09-27 Direction Drilling Operation Performed - Horizontal
2017-09-28 Intermediate Casing Operation Performed
2017-10-01 Finished Drilling
2017-10-01 Well Log Performed
2017-10-01 Well Mode changed to Drilled and Cased
2017-10-02 Liner Casing Operation Performed
2017-10-02 Well Log Performed
2017-10-03 Rig Released
2017-11-04 Perforation Treatment Performed - Multi-Stage Fracture
2017-11-23 Well Began Production
2017-11-23 Well Fluid changed to Crude Oil
2017-11-23 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-09-24 Beaver Drilling Ltd. 7 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-09-26 871.70 Deviate (5 - 79 degrees)
2017-09-27 1281.60 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-11-04 Multi-Stage Fracture 3177.40 3177.50 0
2017-11-04 Multi-Stage Fracture 2601.00 2601.10 0
2017-11-04 Multi-Stage Fracture 2524.30 2524.40 0
2017-11-04 Multi-Stage Fracture 2447.40 2447.50 0
2017-11-04 Multi-Stage Fracture 2370.50 2370.60 0
2017-11-04 Multi-Stage Fracture 2293.70 2293.80 0
2017-11-04 Multi-Stage Fracture 2217.00 2217.10 0
2017-11-04 Multi-Stage Fracture 2140.30 2140.40 0
2017-11-04 Multi-Stage Fracture 2063.80 2063.90 0
2017-11-04 Multi-Stage Fracture 1987.40 1987.50 0
2017-11-04 Multi-Stage Fracture 1910.20 1910.30 0
2017-11-04 Multi-Stage Fracture 3114.80 3114.90 0
2017-11-04 Multi-Stage Fracture 1834.00 1834.10 0
2017-11-04 Multi-Stage Fracture 1756.80 1756.90 0
2017-11-04 Multi-Stage Fracture 1680.00 1680.10 0
2017-11-04 Multi-Stage Fracture 1603.20 1603.30 0
2017-11-04 Multi-Stage Fracture 1526.10 1526.20 0
2017-11-04 Multi-Stage Fracture 1449.80 1449.90 0
2017-11-04 Multi-Stage Fracture 1373.40 1373.50 0
2017-11-04 Multi-Stage Fracture 3051.70 3051.80 0
2017-11-04 Multi-Stage Fracture 2989.00 2989.10 0
2017-11-04 Multi-Stage Fracture 2926.50 2926.60 0
2017-11-04 Multi-Stage Fracture 2864.50 2864.60 0
2017-11-04 Multi-Stage Fracture 2802.70 2802.80 0
2017-11-04 Multi-Stage Fracture 2740.30 2740.40 0
2017-11-04 Multi-Stage Fracture 2677.60 2677.70 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-11-04 2017-11-04 1,161 1,662 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 89.0541 N/A
Sand (30/50) Ottawa Canyon Technical Services Aluminum Oxide 1344-28-1 100 10.2655 N/A
Crystalline silica. quartz 14808-60-7 100 10.2655 N/A
Iron Oxide 1309-37-1 100 10.2655 N/A
Titanium Oxide 13463-67-7 100 10.2655 N/A
TurboProp (30/50) Canyon Technical Services Crystalline silica. quartz 14808-60-7 100 9.5641 N/A
Water-soluble polymer Not Available 100 9.5641 N/A
AQUCAR DB20 Biocide Trican Well Service Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.013 N/A
2-mercaptoethanol 60-24-2 100 0.013 N/A
dibromoacetonitrile 3252-43-5 100 0.013 N/A
non-hazardous ingredients Not Available 100 0.013 N/A
sodium bromide 7647-15-6 100 0.013 N/A
CC-8 Clay Stabilizer Trican Well Service Clay Control choline chloride 67-48-1 100 0.1031 N/A
non-hazardous ingredients Not Available 100 0.1031 N/A
CAN-2412 Non-emulsifier Canyon Technical Services Demulsifier 1-Hexanol. 2-ethyl-. manuf. of.
by-products from. distn. residues
68609-68-7 100 0.0435 N/A
Benzenesulfonic acid. dodecyl-.
compd. with 2-aminoethanol (1:1)
26836-07-7 100 0.0435 N/A
Methanol 67-56-1 100 0.0435 N/A
Poly(oxyethelyne. oxypropylene) copolymer. liquids 11/6/9003 100 0.0435 N/A
Water 7732-18-5 100 0.0435 N/A
Nitrogen Gas Canyon Technical Services Energizing Fluid Nitrogen 7727-37-9 100 0.871 N/A
Non-hazardous base ingredient(s) Not Available 100 0.8711 N/A
CAN-2057 Friction Reducer Canyon Technical Services Gelling Agent No hazardous ingredients Not Available 100 0.0593 N/A
SS-9 Surfactant Canyon Technical Services Surfactant No specific ingredients Not Available 100 0.0216 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-11-03 2017-11-04 Surface Water - Runoff 1680

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 904 0.0 0.0 0.0
2018 963 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-10-01 No Incident Encountered 0.00 0.00
2017-11-12 No Incident Encountered 0.00 0.00

For data sources see[10]

References