If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0836070312000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.155899,"lon":-119.055677,"icon":""}]} |
Location: 00/12-03-083-07W6/0 | |
Location Alias: 00/12-03-83-07 W6M | |
Location Alias 2: 00/12-03-083-07 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 083 | |
Meridian: 6 | |
Range: 07 | |
Section: 03 | |
County/Municipality: Saddle Hills County | |
Well Name: HARVEST HZ 102 ROYCE 12-3-83-7 | |
Operator Name: Harvest Operations Corp. | |
License Number: 0481036 | |
License Date: 2016-10-28 | |
License Status: Amended | |
Spud Date: 2016-12-10 | |
Final Drill Date: 2016-12-26 | |
Well Total Depth: 3404.00 m | |
Surface Hole Latitude: 56.155899 | |
Surface Hole Longitude: -119.055677 |
Date | Event |
---|---|
2016-10-28 | Obtained License |
2016-12-11 | Surface Casing Operation Performed |
2016-12-14 | Direction Drilling Operation Performed - Deviate |
2016-12-16 | Direction Drilling Operation Performed - Horizontal |
2016-12-17 | Intermediate Casing Operation Performed |
2016-12-26 | Finished Drilling |
2016-12-26 | Perforation Treatment Performed - Open-Hole Completion |
2016-12-26 | Well Log Performed |
2016-12-26 | Well Mode changed to Drilled and Cased |
2016-12-27 | Rig Released |
2017-02-01 | Well Began Production |
2017-02-01 | Well Fluid changed to Crude Oil |
2017-02-01 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2016-12-14 | 858.90 | Deviate (5 - 79 degrees) |
2016-12-16 | 1388.10 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2016-12-26 | Open Hole/Barefoot Completion | 1487.00 | 3404.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2017 | 7414 | 0.0 | 0.0 | 0.0 |
2018 | 8129 | 0.0 | 0.0 | 0.0 |
2019 | 8198 | 0.0 | 0.0 | 0.0 |
2020 | 2127 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2016-12-27 | No Incident Encountered | 0.00 | 0.00 |
2017-01-27 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]