X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0835242612000

Well Details

Well ID: 0835242612000
Loading map...
Location: 00/12-26-083-24W5/0
Location Alias: 00/12-26-83-24 W5M
Location Alias 2: 00/12-26-083-24 W5/00
Country: Canada
Province: Alberta
Township: 083
Meridian: 5
Range: 24
Section: 26
County/Municipality: Municipal District of Peace No. 135
Well Name: CANAMAX HZ ANTHONY 12-26-83-24
Operator Name: Canamax Energy Ltd.
License Number: 0481659
License Date: 2016-11-29
License Status: Issued
Spud Date: 2017-01-09
Final Drill Date: 2017-01-11
Well Total Depth: 2292.00 m
Surface Hole Latitude: 56.226331
Surface Hole Longitude: -117.665494

For data sources see[1][2]

Well History

Date Event
2016-11-29 Obtained License
2017-01-09 Surface Casing Operation Performed
2017-01-10 Direction Drilling Operation Performed - Deviate
2017-01-10 Direction Drilling Operation Performed - Horizontal
2017-01-11 Finished Drilling
2017-01-11 Well Log Performed
2017-01-11 Well Mode changed to Drilled and Cased
2017-01-12 Production Casing Operation Performed
2017-01-12 Rig Released
2017-02-24 Perforation Treatment Performed - Multi-Stage Fracture
2017-02-25 Perforation Treatment Performed - Multi-Stage Fracture
2017-06-01 Well Began Production
2017-06-01 Well Fluid changed to Crude Oil
2017-06-01 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-01-09 Nabors Drilling Canada Limited 21 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-01-10 603.10 Deviate (5 - 79 degrees)
2017-01-10 988.60 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-02-24 Multi-Stage Fracture 2222.40 2223.10 0
2017-02-24 Multi-Stage Fracture 1914.80 1915.70 0
2017-02-24 Multi-Stage Fracture 1889.90 1890.80 0
2017-02-25 Multi-Stage Fracture 1864.80 1865.70 0
2017-02-25 Multi-Stage Fracture 1840.00 1840.80 0
2017-02-25 Multi-Stage Fracture 1815.00 1815.90 0
2017-02-25 Multi-Stage Fracture 1778.00 1778.80 0
2017-02-25 Multi-Stage Fracture 1740.90 1741.80 0
2017-02-25 Multi-Stage Fracture 1703.40 1704.20 0
2017-02-25 Multi-Stage Fracture 1666.30 1667.10 0
2017-02-25 Multi-Stage Fracture 1641.10 1642.00 0
2017-02-24 Multi-Stage Fracture 2185.90 2186.70 0
2017-02-25 Multi-Stage Fracture 1616.00 1616.90 0
2017-02-25 Multi-Stage Fracture 1590.80 1591.70 0
2017-02-25 Multi-Stage Fracture 1566.00 1566.80 0
2017-02-25 Multi-Stage Fracture 1529.60 1530.40 0
2017-02-25 Multi-Stage Fracture 1504.30 1505.10 0
2017-02-25 Multi-Stage Fracture 1467.30 1468.10 0
2017-02-25 Multi-Stage Fracture 1430.30 1431.10 0
2017-02-25 Multi-Stage Fracture 1393.00 1393.90 0
2017-02-25 Multi-Stage Fracture 1355.70 1356.60 0
2017-02-25 Multi-Stage Fracture 1318.60 1319.40 0
2017-02-24 Multi-Stage Fracture 2148.50 2149.30 0
2017-02-25 Multi-Stage Fracture 1281.50 1282.40 0
2017-02-25 Multi-Stage Fracture 1244.30 1245.20 0
2017-02-25 Multi-Stage Fracture 1207.10 1207.90 0
2017-02-25 Multi-Stage Fracture 1169.80 1170.60 0
2017-02-25 Multi-Stage Fracture 1132.70 1133.50 0
2017-02-25 Multi-Stage Fracture 1095.40 1096.20 0
2017-02-25 Multi-Stage Fracture 1058.60 1059.50 0
2017-02-25 Multi-Stage Fracture 1021.60 1022.40 0
2017-02-24 Multi-Stage Fracture 2111.30 2112.20 0
2017-02-24 Multi-Stage Fracture 2074.40 2075.20 0
2017-02-24 Multi-Stage Fracture 2036.80 2037.70 0
2017-02-24 Multi-Stage Fracture 2000.60 2001.40 0
2017-02-24 Multi-Stage Fracture 1964.50 1965.30 0
2017-02-24 Multi-Stage Fracture 1939.30 1940.10 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-02-24 2017-02-25 880 1,045 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 88.7591 N/A
20/40 SB Excel Step Energy Services Quartz (SiO2) 14808-60-7 100 9.8934 N/A
SRA-1W (Resin Activator) Step Energy Services Activator Alcohols. C12-14 Secondary. Ethoxylated 84133-50-6 100 0.3839 N/A
Methyl alcohol 67-56-1 100 0.3839 N/A
Polyethylene Glycol 25322-68-3 100 0.3839 N/A
Econocide B1008 (Biocide) Step Energy Services Bactericide/Biocide 2-bromo-2-nitro.3-diol 52-51-7 100 0.0102 N/A
Methyl Alcohol 67-56-1 100 0.0102 N/A
Non-Hazardous Ingredients Not Available 100 0.0102 N/A
SBO-3 (Breaker) Step Energy Services Breaker Persulfate compounds 7727-54-0 100 0.0715 N/A
SCS-6A (Clay Control) Step Energy Services Clay Control Non-Hazardous Ingredients Not Available 100 0.1023 N/A
SWG-201L (Gellant) Step Energy Services Gelling Agent Non-Hazardous Ingredients Not Available 100 0.6498 N/A
SFE-5 (Nano Surfactant) Step Energy Services Surfactant Proprietary Not Available 100 0.1295 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-02-20 2017-02-25 Surface Water - Runoff 1142

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 5080 0.0 0.0 0.0
2018 8602 0.0 0.0 0.0
2019 8488 0.0 0.0 0.0
2020 2136 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-01-12 No Incident Encountered 0.00 0.00
2017-03-13 No Incident Encountered 0.00 0.00

For data sources see[10]

References