X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0835233411000

Well Details

Well ID: 0835233411000
Loading map...
Location: 00/11-34-083-23W5/0
Location Alias: 00/11-34-83-23 W5M
Location Alias 2: 00/11-34-083-23 W5/00
Country: Canada
Province: Alberta
Township: 083
Meridian: 5
Range: 23
Section: 34
County/Municipality: Municipal District of Peace No. 135
Well Name: CANAMAX HZ GRIMSHAW 11-34-83-23
Operator Name: Canamax Energy Ltd.
License Number: 0494176
License Date: 2019-04-10
License Status: Amended
Spud Date: 2019-07-18
Final Drill Date: 2019-07-21
Well Total Depth: 2500.00 m
Surface Hole Latitude: 56.238379
Surface Hole Longitude: -117.574093

For data sources see[1][2]


Directional Drilling

Start Date Depth (m) Reason
2019-07-19 577.40 Deviate (5 - 79 degrees)
2019-07-20 958.50 Horizontal

For data sources see[3]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-08-03 Multi-Stage Fracture 2396.50 2396.60 0
2019-08-04 Multi-Stage Fracture 2150.40 2150.50 0
2019-08-04 Multi-Stage Fracture 2123.20 2123.30 0
2019-08-04 Multi-Stage Fracture 2096.00 2096.10 0
2019-08-04 Multi-Stage Fracture 2068.50 2068.60 0
2019-08-04 Multi-Stage Fracture 2041.00 2041.10 0
2019-08-04 Multi-Stage Fracture 2014.30 2014.40 0
2019-08-04 Multi-Stage Fracture 1986.80 1986.90 0
2019-08-04 Multi-Stage Fracture 1959.40 1959.50 0
2019-08-04 Multi-Stage Fracture 1932.00 1932.10 0
2019-08-04 Multi-Stage Fracture 1904.60 1904.70 0
2019-08-03 Multi-Stage Fracture 2369.20 2369.30 0
2019-08-04 Multi-Stage Fracture 1877.10 1877.20 0
2019-08-04 Multi-Stage Fracture 1849.70 1849.80 0
2019-08-04 Multi-Stage Fracture 1822.20 1822.30 0
2019-08-04 Multi-Stage Fracture 1794.70 1794.80 0
2019-08-04 Multi-Stage Fracture 1767.60 1767.70 0
2019-08-04 Multi-Stage Fracture 1740.10 1740.20 0
2019-08-04 Multi-Stage Fracture 1712.60 1712.70 0
2019-08-04 Multi-Stage Fracture 1687.00 1687.10 0
2019-08-04 Multi-Stage Fracture 1661.00 1661.10 0
2019-08-04 Multi-Stage Fracture 1634.50 1634.60 0
2019-08-03 Multi-Stage Fracture 2341.90 2342.00 0
2019-08-04 Multi-Stage Fracture 1607.70 1607.80 0
2019-08-04 Multi-Stage Fracture 1581.40 1581.50 0
2019-08-04 Multi-Stage Fracture 1554.00 1554.10 0
2019-08-04 Multi-Stage Fracture 1526.50 1526.60 0
2019-08-04 Multi-Stage Fracture 1499.00 1499.10 0
2019-08-04 Multi-Stage Fracture 1471.50 1471.60 0
2019-08-04 Multi-Stage Fracture 1444.70 1444.80 0
2019-08-04 Multi-Stage Fracture 1418.80 1418.90 0
2019-08-04 Multi-Stage Fracture 1391.30 1391.40 0
2019-08-04 Multi-Stage Fracture 1363.80 1363.90 0
2019-08-03 Multi-Stage Fracture 2314.70 2314.80 0
2019-08-04 Multi-Stage Fracture 1336.60 1336.70 0
2019-08-04 Multi-Stage Fracture 1309.50 1309.60 0
2019-08-04 Multi-Stage Fracture 1282.60 1282.70 0
2019-08-04 Multi-Stage Fracture 1256.00 1256.10 0
2019-08-03 Multi-Stage Fracture 2287.20 2287.30 0
2019-08-03 Multi-Stage Fracture 2259.70 2259.80 0
2019-08-04 Multi-Stage Fracture 2232.20 2232.30 0
2019-08-04 Multi-Stage Fracture 2205.40 2205.50 0
2019-08-04 Multi-Stage Fracture 2177.90 2178.00 0

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-08-03 2019-08-04 866 1,482 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Nitrogen Not Available 100 11.634 N/A
Water 7732-18-5 100 75.8909 N/A
20/40 SiberProp Step Energy Services Crystalline Silica (Quartz) 14808-60-7 100 11.5834 N/A
SRA-1W (Resin Activator) Step Energy Services Activator Alcohols. C12-14-Secondary. Ethoxylated 84133-50-6 100 0.2568 N/A
Methyl Alcohol 67-56-1 100 0.2568 N/A
Polyethylene Glycol 25322-68-3 100 0.2568 N/A
Secure BIO-10B (Biocide) Step Energy Services Bactericide/Biocide 2-bromo-2-nitro.3-diol 52-51-7 100 0.007 N/A
Methyl Alcohol 67-56-1 100 0.007 N/A
SBE-2 (Breaker) Step Energy Services Breaker Non-Hazardous Ingredients Not Available 100 0.0341 N/A
Sodium chloride 7647-14-5 100 0.0341 N/A
SFS-1 (Clay Control) Step Energy Services Clay Control Proprietary Trade Secret 100 0.1037 N/A
Water 7732-18-5 100 0.1037 N/A
SWG-101L (Gellant) Step Energy Services Gelling Agent Guar gum 9000-30-0 100 0.421 N/A
Petroleum distillates. hydrotreated light 64742-47-8 100 0.421 N/A
SSI-1 (Scale Inhibitor) Step Energy Services Scale Inhibitor Methyl Alcohol 67-56-1 100 0.0068 N/A
Non-Hazardous Ingredients Not Available 100 0.0068 N/A

For data sources see[5]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-08-03 2019-08-04 Surface Water - Runoff 1587

For data sources see[6]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 2972 0.0 0.0 0.0
2020 2170 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-07-22 No Incident Encountered 0.00 0.00
2019-08-14 No Incident Encountered 0.00 0.00

For data sources see[8]

References