X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0835233016020

Well Details

Well ID: 0835233016020
Loading map...
Location: 02/16-30-083-23W5/0
Location Alias: 02/16-30-83-23 W5M
Location Alias 2: 02/16-30-083-23 W5/00
Country: Canada
Province: Alberta
Township: 083
Meridian: 5
Range: 23
Section: 30
County/Municipality: Municipal District of Peace No. 135
Well Name: CANAMAX GRIMSHAW 16-30-83-23
Operator Name: Canamax Energy Ltd.
License Number: 0440383
License Date: 2011-12-05
License Status: Issued
Spud Date: 2011-12-13
Final Drill Date: 2012-01-02
Well Total Depth: 2610.00 m
Surface Hole Latitude: 56.217142
Surface Hole Longitude: -117.622287

For data sources see[1][2]

Well History

Date Event
2011-12-05 Obtained License
2011-12-14 Surface Casing Operation Performed
2011-12-15 Direction Drilling Operation Performed - Horizontal
2011-12-20 Intermediate Casing Operation Performed
2011-12-20 Well Log Performed
2012-01-02 Finished Drilling
2012-01-02 Well Log Performed
2012-01-02 Well Mode changed to Drilled and Cased
2012-01-06 Liner Casing Operation Performed
2012-01-06 Perforation Treatment Performed - Open-Hole Completion
2012-01-07 Rig Released
2012-01-23 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-01 Well Fluid changed to Crude Oil
2012-02-01 Well Mode changed to Drilling and Completing
2012-02-03 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-01 Well Began Production
2012-03-01 Well Fluid changed to Crude Oil
2012-03-01 Well Mode changed to Pumping
2012-08-27 Well Fluid changed to Crude Oil
2012-08-27 Well Mode changed to Suspended
2012-09-01 Well Began Injection
2012-09-01 Well Fluid changed to Water
2012-09-01 Well Type changed to Injection

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-12-15 447.40 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-01-06 Open Hole/Barefoot Completion 2605.00 2610.00 0
2012-02-03 Multi-Stage Fracture 1560.40 1560.50 0
2012-02-03 Multi-Stage Fracture 1451.70 1451.80 0
2012-02-03 Multi-Stage Fracture 1370.30 1370.40 0
2012-01-23 Multi-Stage Fracture 2597.20 2597.30 0
2012-01-23 Multi-Stage Fracture 2528.40 2528.50 0
2012-02-03 Multi-Stage Fracture 2282.90 2283.00 0
2012-02-03 Multi-Stage Fracture 2168.50 2168.60 0
2012-02-03 Multi-Stage Fracture 2051.20 2051.30 0
2012-02-03 Multi-Stage Fracture 1928.20 1928.30 0
2012-02-03 Multi-Stage Fracture 1800.60 1800.70 0
2012-02-03 Multi-Stage Fracture 1680.50 1680.60 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 3976 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-07-12 No Incident Encountered 0.00 0.00

For data sources see[7]

References