X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0835232915000

Well Details

Well ID: 0835232915000
Loading map...
Location: 00/15-29-083-23W5/0
Location Alias: 00/15-29-83-23 W5M
Location Alias 2: 00/15-29-083-23 W5/00
Country: Canada
Province: Alberta
Township: 083
Meridian: 5
Range: 23
Section: 29
County/Municipality: Municipal District of Peace No. 135
Well Name: CANAMAX GRIMSHAW 15-29-83-23
Operator Name: Canamax Energy Ltd.
License Number: 0434605
License Date: 2011-06-24
License Status: Issued
Spud Date: 2011-07-28
Final Drill Date: 2011-08-08
Well Total Depth: 2295.00 m
Surface Hole Latitude: 56.217810
Surface Hole Longitude: -117.598032

For data sources see[1][2]

Well History

Date Event
2011-06-24 Obtained License
2011-07-29 Surface Casing Operation Performed
2011-07-30 Direction Drilling Operation Performed - Horizontal
2011-08-03 Intermediate Casing Operation Performed
2011-08-08 Finished Drilling
2011-08-08 Well Mode changed to Drilled and Cased
2011-08-11 Liner Casing Operation Performed
2011-08-11 Perforation Treatment Performed - Open-Hole Completion
2011-08-11 Rig Released
2011-09-12 Perforation Treatment Performed - Multi-Stage Fracture
2011-09-14 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-09 Well Began Production
2011-10-09 Well Fluid changed to Crude Oil
2011-10-09 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-07-30 518.70 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-08-11 Open Hole/Barefoot Completion 2291.00 2295.00 0
2011-09-12 Multi-Stage Fracture 1638.30 1638.40 0
2011-09-12 Multi-Stage Fracture 1563.00 1563.10 0
2011-09-12 Multi-Stage Fracture 1490.10 1490.20 0
2011-09-14 Multi-Stage Fracture 1417.00 1417.10 0
2011-09-14 Multi-Stage Fracture 1345.50 1345.60 0
2011-09-14 Multi-Stage Fracture 1261.40 1261.50 0
2011-09-14 Multi-Stage Fracture 1188.70 1188.80 0
2011-09-12 Multi-Stage Fracture 2281.60 2281.70 0
2011-09-12 Multi-Stage Fracture 2190.60 2190.70 0
2011-09-12 Multi-Stage Fracture 2095.30 2095.40 0
2011-09-12 Multi-Stage Fracture 2019.00 2019.10 0
2011-09-12 Multi-Stage Fracture 1942.60 1942.70 0
2011-09-12 Multi-Stage Fracture 1869.80 1869.90 0
2011-09-12 Multi-Stage Fracture 1794.30 1794.40 0
2011-09-12 Multi-Stage Fracture 1719.00 1719.10 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 1488 0.0 0.0 0.0
2012 8333 0.0 0.0 0.0
2013 8557 0.0 0.0 0.0
2014 8507 0.0 0.0 0.0
2015 8275 0.0 0.0 0.0
2016 8495 0.0 0.0 0.0
2017 8668 0.0 0.0 0.0
2018 8516 0.0 0.0 0.0
2019 8159 0.0 0.0 0.0
2020 2171 0.0 0.0 0.0

For data sources see[6]

References