X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0835232815020

Well Details

Well ID: 0835232815020
Loading map...
Location: 02/15-28-083-23W5/0
Location Alias: 02/15-28-83-23 W5M
Location Alias 2: 02/15-28-083-23 W5/00
Country: Canada
Province: Alberta
Township: 083
Meridian: 5
Range: 23
Section: 28
County/Municipality: Municipal District of Peace No. 135
Well Name: CANAMAX HZ 102 GRIMSHAW 15-28-83-23
Operator Name: Canamax Energy Ltd.
License Number: 0494177
License Date: 2019-04-10
License Status: Amended
Spud Date: 2019-07-23
Final Drill Date: 2019-07-28
Well Total Depth: 2534.00 m
Surface Hole Latitude: 56.214907
Surface Hole Longitude: -117.563673

For data sources see[1][2]


Directional Drilling

Start Date Depth (m) Reason
2019-07-26 551.60 Deviate (5 - 79 degrees)
2019-07-26 946.60 Horizontal

For data sources see[3]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-08-05 Multi-Stage Fracture 2491.70 2491.80 0
2019-08-05 Multi-Stage Fracture 2245.50 2245.60 0
2019-08-05 Multi-Stage Fracture 2218.00 2218.10 0
2019-08-05 Multi-Stage Fracture 2191.10 2191.20 0
2019-08-05 Multi-Stage Fracture 2163.10 2163.20 0
2019-08-05 Multi-Stage Fracture 2136.10 2136.20 0
2019-08-05 Multi-Stage Fracture 2108.60 2108.70 0
2019-08-05 Multi-Stage Fracture 2081.10 2081.20 0
2019-08-05 Multi-Stage Fracture 2053.60 2053.70 0
2019-08-05 Multi-Stage Fracture 2026.10 2026.20 0
2019-08-05 Multi-Stage Fracture 1998.70 1998.80 0
2019-08-05 Multi-Stage Fracture 2464.20 2464.30 0
2019-08-06 Multi-Stage Fracture 1971.20 1971.30 0
2019-08-06 Multi-Stage Fracture 1944.00 1944.10 0
2019-08-06 Multi-Stage Fracture 1916.70 1916.80 0
2019-08-06 Multi-Stage Fracture 1889.30 1889.40 0
2019-08-06 Multi-Stage Fracture 1861.90 1862.00 0
2019-08-06 Multi-Stage Fracture 1834.80 1834.90 0
2019-08-06 Multi-Stage Fracture 1807.40 1807.50 0
2019-08-06 Multi-Stage Fracture 1780.20 1780.30 0
2019-08-06 Multi-Stage Fracture 1752.70 1752.80 0
2019-08-06 Multi-Stage Fracture 1725.40 1725.50 0
2019-08-05 Multi-Stage Fracture 2436.90 2437.00 0
2019-08-06 Multi-Stage Fracture 1698.00 1698.10 0
2019-08-06 Multi-Stage Fracture 1670.60 1670.70 0
2019-08-06 Multi-Stage Fracture 1643.30 1643.40 0
2019-08-06 Multi-Stage Fracture 1615.80 1615.90 0
2019-08-06 Multi-Stage Fracture 1588.50 1588.60 0
2019-08-06 Multi-Stage Fracture 1562.80 1562.90 0
2019-08-06 Multi-Stage Fracture 1535.30 1535.40 0
2019-08-06 Multi-Stage Fracture 1507.80 1507.90 0
2019-08-06 Multi-Stage Fracture 1480.30 1480.40 0
2019-08-06 Multi-Stage Fracture 1452.80 1452.90 0
2019-08-05 Multi-Stage Fracture 2409.60 2409.70 0
2019-08-06 Multi-Stage Fracture 1425.70 1425.80 0
2019-08-06 Multi-Stage Fracture 1398.30 1398.40 0
2019-08-06 Multi-Stage Fracture 1370.80 1370.90 0
2019-08-06 Multi-Stage Fracture 1343.50 1343.60 0
2019-08-06 Multi-Stage Fracture 1316.00 1316.10 0
2019-08-06 Multi-Stage Fracture 1288.50 1288.60 0
2019-08-06 Multi-Stage Fracture 1261.20 1261.30 0
2019-08-05 Multi-Stage Fracture 2382.10 2382.20 0
2019-08-05 Multi-Stage Fracture 2354.60 2354.70 0
2019-08-05 Multi-Stage Fracture 2327.30 2327.40 0
2019-08-05 Multi-Stage Fracture 2300.20 2300.30 0
2019-08-05 Multi-Stage Fracture 2273.00 2273.10 0

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-08-05 2019-08-06 829 1,530 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Nitrogen Not Available 100 11.3821 N/A
Water 7732-18-5 100 76.2073 N/A
20/40 SiberProp Step Energy Services Crystalline Silica (Quartz) 14808-60-7 100 11.5105 N/A
SRA-1W (Resin Activator) Step Energy Services Activator Alcohols. C12-14-Secondary. Ethoxylated 84133-50-6 100 0.2537 N/A
Methyl Alcohol 67-56-1 100 0.2537 N/A
Polyethylene Glycol 25322-68-3 100 0.2537 N/A
Secure BIO-10B (Biocide) Step Energy Services Bactericide/Biocide 2-bromo-2-nitro.3-diol 52-51-7 100 0.0078 N/A
Methyl Alcohol 67-56-1 100 0.0078 N/A
SBE-2 (Breaker) Step Energy Services Breaker Non-Hazardous Ingredients Not Available 100 0.035 N/A
Sodium chloride 7647-14-5 100 0.035 N/A
SFS-1 (Clay Control) Step Energy Services Clay Control Proprietary Trade Secret 100 0.1036 N/A
Water 7732-18-5 100 0.1036 N/A
SWG-101L (Gellant) Step Energy Services Gelling Agent Guar gum 9000-30-0 100 0.4237 N/A
Petroleum distillates. hydrotreated light 64742-47-8 100 0.4237 N/A
SSI-1 (Scale Inhibitor) Step Energy Services Scale Inhibitor Methyl Alcohol 67-56-1 100 0.0096 N/A
Non-Hazardous Ingredients Not Available 100 0.0096 N/A

For data sources see[5]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-08-05 2019-08-06 Surface Water - Runoff 1820

For data sources see[6]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 2962 0.0 0.0 0.0
2020 2171 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-07-30 No Incident Encountered 0.00 0.00
2019-08-16 No Incident Encountered 0.00 0.00

For data sources see[8]

References