X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0835232311000

Well Details

Well ID: 0835232311000
Loading map...
Location: 00/11-23-083-23W5/0
Location Alias: 00/11-23-83-23 W5M
Location Alias 2: 00/11-23-083-23 W5/00
Country: Canada
Province: Alberta
Township: 083
Meridian: 5
Range: 23
Section: 23
County/Municipality: Municipal District of Peace No. 135
Well Name: CANAMAX GRIMSHAW 11-23-83-23
Operator Name: Canamax Energy Ltd.
License Number: 0054698
License Date: 1975-08-26
License Status: Suspension
Spud Date: 1975-08-27
Final Drill Date: 1975-09-01
Well Total Depth: 801.60 m
Surface Hole Latitude: 56.213863
Surface Hole Longitude: -117.523295

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-08-26 Obtained License
1975-09-01 Finished Drilling
1975-09-02 Drill Stem Test Performed
1975-09-04 Drill Stem Test Performed
1975-09-04 Production Casing Operation Performed
1975-12-10 Perforation Treatment Performed - Jet Perforation
1976-01-27 Well Mode changed to Drilled and Cased
1986-03-25 Well Began Production
1986-03-25 Well Fluid changed to Gas
1986-03-25 Well Mode changed to Flowing
1996-12-04 Well Log Performed
1996-12-06 Perforation Treatment Performed - Jet Perforation
2004-03-22 Well Log Performed
2004-03-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-03-23 Perforation Treatment Performed - Jet Perforation
2004-03-23 Plug Back Performed
2004-03-23 Well Log Performed
2004-03-26 Perforation Treatment Performed - Jet Perforation
2004-03-26 Well Log Performed
2004-03-31 Well Fluid changed to Gas
2004-03-31 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-12-10 Perforation 770.90 772.10 7
1975-12-10 Perforation 774.50 775.70 7
1996-12-06 Perforation 770.80 772.00 20
1996-12-06 Perforation 774.50 775.70 20
2004-03-23 Packing Device Capped w/Cement 752.00 760.00 0
2004-03-23 Perforation 703.50 707.50 17
2004-03-26 Perforation 695.00 697.50 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 48 0.0 0.0 0.0
1986 3293 0.0 0.0 0.0
1987 2452 0.0 0.0 0.0
1988 2401 0.0 0.0 0.0
1989 2248 0.0 0.0 0.0
1990 2825 0.0 0.0 0.0
1991 2242 0.0 0.0 0.0
1992 2331 0.0 0.0 0.0
1993 3697 0.0 0.0 0.0
1994 2537 0.0 0.0 0.0
1995 2490 0.0 0.0 0.0
1996 7716 0.0 0.0 0.0
1997 6086 0.0 0.0 0.0
1998 8544 0.0 0.0 0.0
1999 8379 0.0 0.0 0.0
2000 8597 0.0 0.0 0.0
2001 8548 0.0 0.0 0.0
2002 7851 0.0 0.0 0.0
2003 1699 0.0 0.0 0.0
2004 24 0.0 0.0 0.0

For data sources see[5]

References