X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0835152508000

Well Details

Well ID: 0835152508000
Loading map...
Location: 00/08-25-083-15W5/0
Location Alias: 00/08-25-83-15 W5M
Location Alias 2: 00/08-25-083-15 W5/00
Country: Canada
Province: Alberta
Township: 083
Meridian: 5
Range: 15
Section: 25
County/Municipality: Northern Sunrise County
Well Name: CDN ROXY ET AL SEAL 8-25-83-15
Operator Name: Devon Canada Corporation
License Number: 0112900
License Date: 1985-01-28
License Status: RecCertified
Spud Date: 1985-02-04
Final Drill Date: 1985-02-19
Well Total Depth: 1775.00 m
Surface Hole Latitude: 56.221939
Surface Hole Longitude: -116.219899

For data sources see[1][2]

Well History

Date Event
1985-01-28 Obtained License
1985-02-07 Surface Casing Operation Performed
1985-02-19 Finished Drilling
1985-02-19 Well Log Performed
1985-02-19 Well Mode changed to Drilled and Cased
1985-02-20 Well Log Performed
1985-02-21 Drill Stem Test Performed
1985-02-23 Production Casing Operation Performed
1985-02-24 Rig Released
1985-03-10 Well Log Performed
1985-03-11 Well Log Performed
1985-03-12 Perforation Treatment Performed - Jet Perforation
1985-03-12 Well Began Production
1985-03-12 Well Fluid changed to Crude Oil
1985-03-12 Well Mode changed to Flowing
1985-03-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-03-18 Well Fluid changed to Crude Oil
1985-03-18 Well Mode changed to Suspended
1985-11-23 Well Fluid changed to Crude Oil
1985-11-23 Well Mode changed to Pumping
1993-03-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-03-16 Plug Back Performed
1993-03-16 Well Fluid changed to Crude Oil
1993-03-16 Well Log Performed
1993-03-16 Well Mode changed to Abandoned
1993-03-19 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-03-12 Perforation 1762.80 1765.00 13
1985-03-14 Acid Treatment 1762.80 1765.00 0
1993-03-16 Packing Device Capped w/Cement 1747.00 1755.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 621 0.0 0.0 0.0
1986 1599 0.0 0.0 0.0
1987 1557 0.0 0.0 0.0
1988 2664 0.0 0.0 0.0
1989 2036 0.0 0.0 0.0
1990 3072 0.0 0.0 0.0
1991 1848 0.0 0.0 0.0
1992 1442 0.0 0.0 0.0

For data sources see[5]

References