If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0835151502040 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
| Location: 04/02-15-083-15W5/0 | |
| Location Alias: 04/02-15-83-15 W5M | |
| Location Alias 2: 04/02-15-083-15 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 083 | |
| Meridian: 5 | |
| Range: 15 | |
| Section: 15 | |
| County/Municipality: Northern Sunrise County | |
| Well Name: BAYTEX SLAVE 2-15-83-15 | |
| Operator Name: Baytex Energy Ltd. | |
| License Number: 0447214 | |
| License Date: 2012-07-17 | |
| License Status: Suspension | |
| Spud Date: 2012-08-01 | |
| Final Drill Date: 2012-08-23 | |
| Well Total Depth: 2388.00 m | |
| Surface Hole Latitude: 56.204270 | |
| Surface Hole Longitude: -116.269490 |
| Date | Event |
|---|---|
| 2012-07-17 | Obtained License |
| 2012-08-01 | Surface Casing Operation Performed |
| 2012-08-02 | Direction Drilling Operation Performed - Horizontal |
| 2012-08-04 | Intermediate Casing Operation Performed |
| 2012-08-04 | Well Log Performed |
| 2012-08-23 | Finished Drilling |
| 2012-08-23 | Liner Casing Operation Performed |
| 2012-08-23 | Well Log Performed |
| 2012-08-23 | Well Mode changed to Drilled and Cased |
| 2012-08-24 | Perforation Treatment Performed - Open-Hole Completion |
| 2012-08-24 | Perforation Treatment Performed - Slotted Liner or Casing |
| 2012-08-24 | Rig Released |
| 2012-10-01 | Well Began Production |
| 2012-10-01 | Well Fluid changed to Crude Bitumen |
| 2012-10-01 | Well Mode changed to Pumping |
| 2017-04-30 | Well Fluid changed to Crude Bitumen |
| 2017-04-30 | Well Mode changed to Suspended |
| 2019-04-25 | Well Log Performed |
| 2019-04-26 | Well Log Performed |
| 2019-05-23 | Well Log Performed |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2012-08-01 | Precision Drilling Corporation | 183 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2012-08-02 | 324.00 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2012-08-24 | Slotted Liner | 864.90 | 2377.00 | 0 |
| 2012-08-24 | Open Hole/Barefoot Completion | 2377.00 | 2388.00 | 0 |
For data sources see[6]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2012 | 2040 | 0.0 | 0.0 | 0.0 |
| 2013 | 8759 | 0.0 | 0.0 | 0.0 |
| 2014 | 8351 | 0.0 | 0.0 | 0.0 |
| 2015 | 3173 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2012-08-24 | No Incident Encountered | 0.00 | 0.00 |
| 2019-09-26 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]