If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0835151502020 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
Location: 02/02-15-083-15W5/0 | |
Location Alias: 02/02-15-83-15 W5M | |
Location Alias 2: 02/02-15-083-15 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 083 | |
Meridian: 5 | |
Range: 15 | |
Section: 15 | |
County/Municipality: Northern Sunrise County | |
Well Name: BAYTEX SLAVE 2-15-83-15 | |
Operator Name: Baytex Energy Ltd. | |
License Number: 0447212 | |
License Date: 2012-07-17 | |
License Status: Amended | |
Spud Date: 2012-08-10 | |
Final Drill Date: 2012-08-16 | |
Well Total Depth: 2611.00 m | |
Surface Hole Latitude: 56.204269 | |
Surface Hole Longitude: -116.269973 |
Date | Event |
---|---|
2012-07-17 | Obtained License |
2012-08-10 | Surface Casing Operation Performed |
2012-08-11 | Direction Drilling Operation Performed - Horizontal |
2012-08-13 | Intermediate Casing Operation Performed |
2012-08-13 | Well Log Performed |
2012-08-16 | Finished Drilling |
2012-08-16 | Well Log Performed |
2012-08-16 | Well Mode changed to Drilled and Cased |
2012-08-17 | Liner Casing Operation Performed |
2012-08-17 | Perforation Treatment Performed - Open-Hole Completion |
2012-08-17 | Perforation Treatment Performed - Slotted Liner or Casing |
2012-08-17 | Rig Released |
2012-10-01 | Well Began Production |
2012-10-01 | Well Fluid changed to Crude Bitumen |
2012-10-01 | Well Mode changed to Pumping |
2017-04-30 | Well Fluid changed to Crude Bitumen |
2017-04-30 | Well Mode changed to Suspended |
2018-01-07 | Well Fluid changed to Crude Bitumen |
2018-01-07 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-08-10 | Precision Drilling Corporation | 183SL | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-08-11 | 187.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-08-17 | Slotted Liner | 1098.50 | 2609.00 | 0 |
2012-08-17 | Open Hole/Barefoot Completion | 2609.00 | 2611.00 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 2064 | 0.0 | 0.0 | 0.0 |
2013 | 8645 | 0.0 | 0.0 | 0.0 |
2014 | 7995 | 0.0 | 0.0 | 0.0 |
2015 | 4796 | 0.0 | 0.0 | 0.0 |
2018 | 7843 | 0.0 | 0.0 | 0.0 |
2019 | 8476 | 0.0 | 0.0 | 0.0 |
2020 | 2118 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-08-17 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]