If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0835151501030 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.204513,"lon":-116.269923,"icon":""}]} |
Location: 03/01-15-083-15W5/0 | |
Location Alias: 03/01-15-83-15 W5M | |
Location Alias 2: 03/01-15-083-15 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 083 | |
Meridian: 5 | |
Range: 15 | |
Section: 15 | |
County/Municipality: Northern Sunrise County | |
Well Name: BAYTEX SLAVE 1-15-83-15 | |
Operator Name: Baytex Energy Ltd. | |
License Number: 0318740 | |
License Date: 2004-11-12 | |
License Status: Issued | |
Spud Date: 2004-11-13 | |
Final Drill Date: 2004-11-20 | |
Well Total Depth: 2329.00 m | |
Surface Hole Latitude: 56.204513 | |
Surface Hole Longitude: -116.269923 |
Date | Event |
---|---|
2004-11-11 | Well Log Performed |
2004-11-12 | Obtained License |
2004-11-15 | Direction Drilling Operation Performed - Horizontal |
2004-11-17 | Production Casing Operation Performed |
2004-11-20 | Finished Drilling |
2004-11-20 | Perforation Treatment Performed - Open-Hole Completion |
2004-11-20 | Well Log Performed |
2004-11-20 | Well Mode changed to Drilled and Cased |
2004-11-22 | Rig Released |
2004-12-28 | Well Began Production |
2004-12-28 | Well Fluid changed to Crude Bitumen |
2004-12-28 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2004-11-15 | 380.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2004-11-20 | Open Hole/Barefoot Completion | 871.00 | 2329.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2004 | 358 | 0.0 | 0.0 | 0.0 |
2005 | 8681 | 0.0 | 0.0 | 0.0 |
2006 | 7137 | 0.0 | 0.0 | 0.0 |
2007 | 8017 | 0.0 | 0.0 | 0.0 |
2008 | 8239 | 0.0 | 0.0 | 0.0 |
2009 | 8747 | 0.0 | 0.0 | 0.0 |
2010 | 8759 | 0.0 | 0.0 | 0.0 |
2011 | 8389 | 0.0 | 0.0 | 0.0 |
2012 | 7737 | 0.0 | 0.0 | 0.0 |
2013 | 8663 | 0.0 | 0.0 | 0.0 |
2014 | 8491 | 0.0 | 0.0 | 0.0 |
2015 | 4367 | 0.0 | 0.0 | 0.0 |
2017 | 0 | 0.0 | 0.0 | 0.0 |
2018 | 4775 | 0.0 | 0.0 | 0.0 |
2019 | 7364 | 0.0 | 0.0 | 0.0 |
2020 | 1700 | 0.0 | 0.0 | 0.0 |
For data sources see[6]