X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0835101108000

Well Details

Well ID: 0835101108000
Loading map...
Location: 00/08-11-083-10W5/0
Location Alias: 00/08-11-83-10 W5M
Location Alias 2: 00/08-11-083-10 W5/00
Country: Canada
Province: Alberta
Township: 083
Meridian: 5
Range: 10
Section: 11
County/Municipality: Northern Sunrise County
Well Name: CELTIC UTIKUMA 1-11-83-10
Operator Name: XTO Energy Canada ULC
License Number: 0162353
License Date: 1993-11-17
License Status: Abandoned
Spud Date: 1994-01-14
Final Drill Date: 1994-01-23
Well Total Depth: 1680.00 m
Surface Hole Latitude: 56.177754
Surface Hole Longitude: -115.454475

For data sources see[1][2]

Well History

Date Event
1993-11-17 Obtained License
1994-01-16 Surface Casing Operation Performed
1994-01-23 Finished Drilling
1994-01-23 Well Log Performed
1994-01-23 Well Mode changed to Drilled and Cased
1994-01-24 Well Log Performed
1994-01-25 Production Casing Operation Performed
1994-01-25 Rig Released
1994-02-09 Perforation Treatment Performed - Jet Perforation
1994-02-09 Well Log Performed
1994-02-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-02-12 Perforation Treatment Performed - Cement Squeeze
1994-02-12 Perforation Treatment Performed - Jet Perforation
1994-02-12 Well Log Performed
1994-02-16 Perforation Treatment Performed - Cement Squeeze
1994-02-19 Perforation Treatment Performed - Jet Perforation
1994-02-19 Well Log Performed
1994-02-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-03-03 Well Began Production
1994-03-03 Well Fluid changed to Crude Oil
1994-03-03 Well Mode changed to Pumping
1994-12-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-12-07 Plug Back Performed
1994-12-07 Well Fluid changed to Crude Oil
1994-12-07 Well Mode changed to Abandoned and Whipstocked
2018-02-26 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-02-09 Perforation 1642.00 1645.00 14
1994-02-09 Perforation 1646.00 1648.00 14
1994-02-10 Acid Treatment 1642.00 1648.00 0
1994-02-12 Perforation 1650.50 1650.80 23
1994-02-12 Cement Squeeze 1650.50 1650.80 0
1994-02-16 Cement Squeeze 1642.00 1649.50 0
1994-02-19 Perforation 1642.00 1644.00 13
1994-02-20 Acid Treatment 1642.00 1644.00 0
1994-12-07 Packing Device Capped w/Cement 1622.00 1630.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 3325 0.0 0.0 0.0

For data sources see[5]

References