X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0826130104020

Well Details

Well ID: 0826130104020
Loading map...
Location: 02/04-01-082-13W6/0
Location Alias: 02/04-01-82-13 W6M
Location Alias 2: 02/04-01-082-13 W6/00
Country: Canada
Province: Alberta
Township: 082
Meridian: 6
Range: 13
Section: 01
County/Municipality: Saddle Hills County
Well Name: GLENOGLE HZ 102 DOE 4-1-82-13
Operator Name: Glenogle Energy Inc.
License Number: 0259843
License Date: 2001-09-21
License Status: Issued
Spud Date: 2001-10-03
Final Drill Date: 2001-10-20
Well Total Depth: 2222.00 m
Surface Hole Latitude: 56.079052
Surface Hole Longitude: -119.894396

For data sources see[1][2]

Well History

Date Event
2001-09-21 Obtained License
2001-10-05 Surface Casing Operation Performed
2001-10-07 Direction Drilling Operation Performed - Horizontal
2001-10-14 Intermediate Casing Operation Performed
2001-10-20 Finished Drilling
2001-10-20 Well Log Performed
2001-10-21 Perforation Treatment Performed - Open-Hole Completion
2001-10-21 Rig Released
2001-10-21 Well Mode changed to Drilled and Cased
2001-10-24 Well Began Production
2001-10-24 Well Fluid changed to Crude Oil
2001-10-24 Well Mode changed to Pumping
2012-01-28 Perforation Treatment Performed - Jet Perforation
2012-02-12 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-12 Perforation Treatment Performed - Open-Hole Completion

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2001-10-07 1236.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-10-21 Open Hole/Barefoot Completion 1788.00 2222.00 0
2012-02-12 Open Hole/Barefoot Completion 2202.70 2222.00 0
2012-01-28 Perforation 1689.00 1692.00 17
2012-02-12 Multi-Stage Fracture 2196.70 2196.80 0
2012-02-12 Multi-Stage Fracture 2106.70 2106.80 0
2012-02-12 Multi-Stage Fracture 2035.20 2035.30 0
2012-02-12 Multi-Stage Fracture 1964.20 1964.30 0
2012-02-12 Multi-Stage Fracture 1906.50 1906.60 0
2012-02-12 Multi-Stage Fracture 1808.40 1808.50 0
2012-02-12 Multi-Stage Fracture 1683.40 1683.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 1302 0.0 0.0 0.0
2002 8342 0.0 0.0 0.0
2003 8494 0.0 0.0 0.0
2004 8710 0.0 0.0 0.0
2005 8174 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8642 0.0 0.0 0.0
2009 8481 0.0 0.0 0.0
2010 8715 0.0 0.0 0.0
2011 8758 0.0 0.0 0.0
2012 5617 0.0 0.0 0.0
2013 7405 0.0 0.0 0.0
2014 8719 0.0 0.0 0.0
2015 8141 0.0 0.0 0.0
2016 8298 0.0 0.0 0.0
2017 7744 0.0 0.0 0.0
2018 8407 0.0 0.0 0.0
2019 8576 0.0 0.0 0.0
2020 1771 0.0 0.0 0.0

For data sources see[6]

References