X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0826103303000

Well Details

Well ID: 0826103303000
Loading map...
Location: 00/03-33-082-10W6/0
Location Alias: 00/03-33-82-10 W6M
Location Alias 2: 00/03-33-082-10 W6/00
Country: Canada
Province: Alberta
Township: 082
Meridian: 6
Range: 10
Section: 33
County/Municipality: Saddle Hills County
Well Name: BASHAW OIL CO BONANZA 3-33-82-10
Operator Name: Clearview Resources Ltd.
License Number: 0054704
License Date: 1975-08-26
License Status: Issued
Spud Date: 1975-09-05
Final Drill Date: 1975-10-03
Well Total Depth: 2673.40 m
Surface Hole Latitude: 56.145860
Surface Hole Longitude: -119.505045

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-08-26 Obtained License
1975-09-11 Drill Stem Test Performed
1975-10-03 Finished Drilling
1975-10-07 Production Casing Operation Performed
1975-11-30 Perforation Treatment Performed - Jet Perforation
1975-12-07 Perforation Treatment Performed - Jet Perforation
1975-12-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-12-12 Perforation Treatment Performed - Cement Squeeze
1975-12-18 Well Mode changed to Drilled and Cased
1978-06-26 Well Began Production
1978-06-26 Well Fluid changed to Gas
1978-06-26 Well Mode changed to Flowing
1981-02-02 Well Fluid changed to Gas
1981-02-02 Well Mode changed to Suspended
1991-01-01 Well Fluid changed to Gas
1991-01-01 Well Mode changed to Flowing
1992-03-30 Well Fluid changed to Gas
1992-03-30 Well Mode changed to Suspended
1992-07-01 Well Fluid changed to Gas
1992-07-01 Well Mode changed to Flowing
2005-04-01 Well Fluid changed to Crude Oil
2005-04-01 Well Mode changed to Pumping
2020-03-31 Well Fluid changed to Crude Oil
2020-03-31 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-11-30 Perforation 1912.30 1916.60 7
1975-12-07 Perforation 1894.90 1898.90 7
1975-12-07 Perforation 1901.30 1905.00 7
1975-12-09 Acid Treatment 1894.90 1905.00 0
1975-12-12 Cement Squeeze 1894.90 1905.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1978 2355 0.0 0.0 0.0
1979 2578 0.0 0.0 0.0
1980 5572 0.0 0.0 0.0
1981 365 0.0 0.0 0.0
1991 528 0.0 0.0 0.0
1992 93 0.0 0.0 0.0
1993 365 0.0 0.0 0.0
1994 1869 0.0 0.0 0.0
1995 90 0.0 0.0 0.0
1996 25 0.0 0.0 0.0
1997 19 0.0 0.0 0.0
1998 651 0.0 0.0 0.0
1999 235 0.0 0.0 0.0
2000 364 0.0 0.0 0.0
2001 84 0.0 0.0 0.0
2002 69 0.0 0.0 0.0
2003 268 0.0 0.0 0.0
2004 6715 0.0 0.0 0.0
2005 4697 0.0 0.0 0.0
2006 3800 0.0 0.0 0.0
2009 1095 0.0 0.0 0.0
2010 5629 0.0 0.0 0.0
2011 5096 0.0 0.0 0.0
2012 4752 0.0 0.0 0.0
2013 4751 0.0 0.0 0.0
2014 7560 0.0 0.0 0.0
2015 7798 0.0 0.0 0.0
2016 7352 0.0 0.0 0.0
2017 7217 0.0 0.0 0.0
2018 6853 0.0 0.0 0.0
2019 5762 0.0 0.0 0.0

For data sources see[5]

References