X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0826103014002

Well Details

Well ID: 0826103014002
Loading map...
Location: 00/14-30-082-10W6/2
Location Alias: 00/14-30-82-10 W6M
Location Alias 2: 00/14-30-082-10 W6/02
Country: Canada
Province: Alberta
Township: 082
Meridian: 6
Range: 10
Section: 30
County/Municipality: Saddle Hills County
Well Name: CNRL BALSAM 14-30-82-10
Operator Name: Canadian Natural Resources Limited
License Number: 0123754
License Date: 1986-08-28
License Status: Suspension
Spud Date: 1986-09-08
Final Drill Date: 1986-09-20
Well Total Depth: 1939.00 m
Surface Hole Latitude: 56.142179
Surface Hole Longitude: -119.554380

For data sources see[1][2]

Well History

Date Event
1986-08-28 Obtained License
1986-09-10 Surface Casing Operation Performed
1986-09-20 Finished Drilling
1986-09-20 Well Mode changed to Drilled and Cased
1986-09-21 Well Log Performed
1986-09-22 Drill Stem Test Performed
1986-09-24 Production Casing Operation Performed
1986-09-24 Rig Released
1986-09-30 Well Log Performed
1986-10-02 Perforation Treatment Performed - Jet Perforation
1989-06-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-06-04 Plug Back Performed
1989-06-04 Well Log Performed
1989-06-05 Perforation Treatment Performed - Jet Perforation
1989-06-06 Perforation Treatment Performed - Fractured
1989-06-12 Well Began Production
1989-06-12 Well Fluid changed to Gas
1989-06-12 Well Mode changed to Flowing
1989-07-01 Well Fluid changed to Gas
1989-07-01 Well Mode changed to Suspended
1990-01-15 Well Fluid changed to Gas
1990-01-15 Well Mode changed to Flowing
1990-04-01 Well Fluid changed to Gas
1990-04-01 Well Mode changed to Suspended
1990-06-01 Well Fluid changed to Gas
1990-06-01 Well Mode changed to Flowing
1990-10-05 Well Log Performed
1997-02-19 Well Log Performed
1997-02-20 Perforation Treatment Performed - Jet Perforation
1997-02-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-02-24 Perforation Treatment Performed - Jet Perforation
1997-02-24 Plug Back Performed
2001-01-01 Well Fluid changed to Gas
2001-01-01 Well Mode changed to Pumping
2011-06-19 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-10-02 Perforation 1876.50 1878.50 13
1989-06-04 Packing Device Capped w/Cement 1858.00 1866.00 0
1989-06-05 Perforation 1048.50 1051.00 13
1989-06-05 Perforation 1052.00 1054.00 13
1989-06-06 Fracture 1048.50 1054.00 0
1997-02-20 Perforation 1134.00 1140.00 18
1997-02-24 Packing Device Capped w/Cement 1112.00 1124.00 0
1997-02-24 Perforation 1082.50 1084.50 18

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1989 164 0.0 0.0 0.0
1990 4309 0.0 0.0 0.0
1991 3946 0.0 0.0 0.0
1997 1543 0.0 0.0 0.0
1998 3042 0.0 0.0 0.0
1999 7955 0.0 0.0 0.0
2000 2974 0.0 0.0 0.0
2001 8046 0.0 0.0 0.0
2002 4434 0.0 0.0 0.0
2003 4993 0.0 0.0 0.0
2004 8079 0.0 0.0 0.0
2005 7912 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8735 0.0 0.0 0.0
2008 8615 0.0 0.0 0.0
2009 8129 0.0 0.0 0.0
2010 7243 0.0 0.0 0.0

For data sources see[5]

References