If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0826102304000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.117662,"lon":-119.455932,"icon":""}]} |
Location: 00/04-23-082-10W6/0 | |
Location Alias: 00/04-23-82-10 W6M | |
Location Alias 2: 00/04-23-082-10 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 082 | |
Meridian: 6 | |
Range: 10 | |
Section: 23 | |
County/Municipality: Saddle Hills County | |
Well Name: WILDERNESS ET AL BALSAM 4-23-82-10 | |
Operator Name: Gear Energy Ltd. | |
License Number: 0356387 | |
License Date: 2006-05-01 | |
License Status: Abandoned | |
Spud Date: 2006-05-31 | |
Final Drill Date: 2006-06-09 | |
Well Total Depth: 2085.00 m | |
Surface Hole Latitude: 56.117662 | |
Surface Hole Longitude: -119.455932 |
Date | Event |
---|---|
2006-05-01 | Obtained License |
2006-06-02 | Surface Casing Operation Performed |
2006-06-09 | Finished Drilling |
2006-06-09 | Well Mode changed to Drilled and Cased |
2006-06-11 | Well Log Performed |
2006-06-12 | Production Casing Operation Performed |
2006-06-13 | Rig Released |
2006-06-26 | Well Log Performed |
2006-06-27 | Perforation Treatment Performed - Jet Perforation |
2006-06-28 | Perforation Treatment Performed - Jet Perforation |
2006-06-28 | Well Log Performed |
2006-07-12 | Well Log Performed |
2006-07-13 | Perforation Treatment Performed - Casing Patch (Over Perfs) |
2006-07-13 | Well Log Performed |
2006-07-18 | Perforation Treatment Performed - Jet Perforation |
2006-07-18 | Well Log Performed |
2006-09-24 | Well Began Production |
2006-09-24 | Well Fluid changed to Crude Oil |
2006-09-24 | Well Mode changed to Flowing |
2007-06-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2007-06-19 | Plug Back Performed |
2007-06-19 | Well Fluid changed to Crude Oil |
2007-06-19 | Well Log Performed |
2007-06-19 | Well Mode changed to Abandoned Zone |
2007-06-20 | Well Abandoned |
2007-06-20 | Well Fluid changed to Crude Oil |
2007-06-20 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2006-06-27 | Perforation | 80.00 | 82.00 | 17 |
2006-06-27 | Perforation | 126.00 | 128.00 | 17 |
2006-06-28 | Perforation | 98.00 | 100.00 | 17 |
2006-07-13 | Casing Patch | 126.00 | 128.00 | 0 |
2006-07-13 | Casing Patch | 98.00 | 100.00 | 0 |
2006-07-13 | Casing Patch | 80.00 | 82.00 | 0 |
2006-07-18 | Perforation | 2028.00 | 2030.50 | 17 |
2006-07-18 | Perforation | 2032.00 | 2034.00 | 17 |
2007-06-19 | Packing Device Capped w/Cement | 2014.00 | 2022.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2006 | 351 | 0.0 | 0.0 | 0.0 |
For data sources see[5]