X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0826042512000

Well Details

Well ID: 0826042512000
Loading map...
Location: 00/12-25-082-04W6/0
Location Alias: 00/12-25-82-04 W6M
Location Alias 2: 00/12-25-082-04 W6/00
Country: Canada
Province: Alberta
Township: 082
Meridian: 6
Range: 04
Section: 25
County/Municipality: Municipal District of Fairview No. 136
Well Name: CNRL GEORGE 12-25-82-4
Operator Name: Canadian Natural Resources Limited
License Number: 0200093
License Date: 1997-04-04
License Status: RecCertified
Spud Date: 1997-06-09
Final Drill Date: 1997-06-17
Well Total Depth: 1480.00 m
Surface Hole Latitude: 56.138687
Surface Hole Longitude: -118.495252

For data sources see[1][2]

Well History

Date Event
1997-04-04 Obtained License
1997-06-11 Surface Casing Operation Performed
1997-06-14 Kick Occurred
1997-06-14 Lost Circulation Occurred
1997-06-17 Finished Drilling
1997-06-17 Well Log Performed
1997-06-17 Well Mode changed to Drilled and Cased
1997-06-18 Well Log Performed
1997-06-19 Production Casing Operation Performed
1997-06-19 Rig Released
1997-08-19 Perforation Treatment Performed - Jet Perforation
1997-08-22 Perforation Treatment Performed - Fractured
1998-02-03 Well Began Production
1998-02-03 Well Fluid changed to Gas
1998-02-03 Well Mode changed to Flowing
2001-05-31 Well Fluid changed to Gas
2001-05-31 Well Mode changed to Suspended
2007-02-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-02-17 Plug Back Performed
2007-02-17 Well Fluid changed to Gas
2007-02-17 Well Log Performed
2007-02-17 Well Mode changed to Abandoned Zone
2007-02-18 Well Abandoned
2007-02-18 Well Fluid changed to Gas
2007-02-18 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-08-19 Perforation 1378.00 1385.00 17
1997-08-22 Fracture 1378.00 1385.00 0
2007-02-17 Packing Device Capped w/Cement 1359.00 1367.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 6436 0.0 0.0 0.0
1999 3510 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1997-06-14 Lost Circulation 1300.00 1300.00
1997-06-14 Kick 1300.00 1300.00

For data sources see[6]

References