X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0816113613000

Well Details

Well ID: 0816113613000
Loading map...
Location: 00/13-36-081-11W6/0
Location Alias: 00/13-36-81-11 W6M
Location Alias 2: 00/13-36-081-11 W6/00
Country: Canada
Province: Alberta
Township: 081
Meridian: 6
Range: 11
Section: 36
County/Municipality: Saddle Hills County
Well Name: CNRL BONANZA 13-36-81-11
Operator Name: Canadian Natural Resources Limited
License Number: 0145478
License Date: 1990-09-20
License Status: Suspension
Spud Date: 1990-11-07
Final Drill Date: 1990-12-01
Well Total Depth: 2240.00 m
Surface Hole Latitude: 56.068680
Surface Hole Longitude: -119.585790

For data sources see[1][2]

Well History

Date Event
1990-09-20 Obtained License
1990-11-07 Lost Circulation Occurred
1990-11-08 Surface Casing Operation Performed
1990-11-17 Direction Drilling Operation Performed - Deviate
1990-12-01 Finished Drilling
1990-12-01 Well Mode changed to Drilled and Cased
1990-12-02 Well Log Performed
1990-12-04 Well Log Performed
1990-12-05 Drill Stem Test Performed
1990-12-06 Drill Stem Test Performed
1990-12-08 Lost Circulation Occurred
1990-12-08 Production Casing Operation Performed
1990-12-09 Rig Released
1991-01-07 Well Log Performed
1991-01-31 Well Log Performed
1991-02-15 Perforation Treatment Performed - Jet Perforation
1991-02-15 Well Log Performed
1991-02-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-02-16 Perforation Treatment Performed - Jet Perforation
1991-02-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-02-17 Perforation Treatment Performed - Cement Squeeze
1991-02-18 Perforation Treatment Performed - Jet Perforation
1991-02-18 Well Log Performed
1991-02-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-02-20 Perforation Treatment Performed - Cement Squeeze
1991-02-24 Perforation Treatment Performed - Jet Perforation
1991-02-24 Well Log Performed
1991-02-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-03-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-03-06 Plug Back Performed
1991-03-06 Well Log Performed
1991-03-07 Perforation Treatment Performed - Jet Perforation
1991-03-10 Perforation Treatment Performed - Jet Perforation
1991-03-10 Well Log Performed
1991-03-12 Perforation Treatment Performed - Fractured
1991-03-12 Well Log Performed
1991-03-14 Well Log Performed
1991-05-12 Perforation Treatment Performed - Cement Squeeze
1991-05-12 Plug Back Performed
1991-12-01 Well Began Production
1991-12-01 Well Fluid changed to Gas
1991-12-01 Well Mode changed to Flowing
1992-01-31 Well Log Performed
1995-04-01 Well Fluid changed to Crude Oil
1995-04-01 Well Mode changed to Flowing
1999-07-31 Well Fluid changed to Crude Oil
1999-07-31 Well Mode changed to Suspended
1999-09-12 Well Log Performed
1999-09-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-09-13 Plug Back Performed
1999-09-13 Well Fluid changed to Crude Oil
1999-09-13 Well Mode changed to Abandoned Zone
1999-09-14 Well Log Performed
1999-09-15 Perforation Treatment Performed - Jet Perforation
2012-09-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-09-12 Perforation Treatment Performed - Cement Plug

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1990-11-17 1687.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1991-02-15 Perforation 2123.50 2123.80 7
1991-02-24 Perforation 2179.00 2184.00 13
1991-02-24 Perforation 2190.00 2196.00 13
1991-02-24 Perforation 2198.00 2202.00 13
1991-02-26 Acid Treatment 2179.00 2202.00 0
1991-03-06 Packing Device Capped w/Cement 2168.00 2176.00 0
1991-03-07 Perforation 2102.50 2111.00 14
1991-03-07 Perforation 2111.80 2115.00 14
1991-03-07 Perforation 2117.00 2119.00 14
1991-03-10 Perforation 1913.30 1920.50 13
1991-03-12 Fracture 1913.30 1920.50 0
1991-02-16 Acid Treatment 2123.50 2123.80 0
1991-05-12 Cement Squeeze 1913.30 1920.50 0
1999-09-13 Packing Device Capped w/Cement 2087.00 2095.00 0
1999-09-13 Packing Device Capped w/Cement 1887.00 1895.00 0
1999-09-15 Perforation 1155.00 1160.00 14
2012-09-12 Packing Device Capped w/Cement 1142.50 1147.50 0
2012-09-12 Cement Plug 1137.50 1142.50 0
1991-02-16 Perforation 2123.50 2123.90 18
1991-02-17 Acid Treatment 2123.50 2123.90 0
1991-02-17 Cement Squeeze 2123.50 2123.90 0
1991-02-18 Perforation 1906.00 1906.40 18
1991-02-18 Perforation 1928.00 1928.40 18
1991-02-19 Acid Treatment 1906.00 1928.40 0
1991-02-20 Cement Squeeze 1906.00 1928.40 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1991 199 0.0 0.0 0.0
1992 8339 0.0 0.0 0.0
1993 8074 0.0 0.0 0.0
1994 6884 0.0 0.0 0.0
1995 4914 0.0 0.0 0.0
1996 7812 0.0 0.0 0.0
1997 8001 0.0 0.0 0.0
1998 524 0.0 0.0 0.0
1999 2385 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1990-11-07 Lost Circulation 81.00 81.00
1990-12-08 Lost Circulation 2240.00 2240.00
2012-09-13 No Incident Encountered 0.00 0.00

For data sources see[7]

References