X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0816112503000

Well Details

Well ID: 0816112503000
Loading map...
Location: 00/03-25-081-11W6/0
Location Alias: 00/03-25-81-11 W6M
Location Alias 2: 00/03-25-081-11 W6/00
Country: Canada
Province: Alberta
Township: 081
Meridian: 6
Range: 11
Section: 25
County/Municipality: Saddle Hills County
Well Name: CNRL BONANZA 3-25-81-11
Operator Name: Canadian Natural Resources Limited
License Number: 0144373
License Date: 1990-06-06
License Status: Suspension
Spud Date: 1990-06-12
Final Drill Date: 1990-07-09
Well Total Depth: 2329.00 m
Surface Hole Latitude: 56.042346
Surface Hole Longitude: -119.580408

For data sources see[1][2]

Well History

Date Event
1990-06-06 Obtained License
1990-06-12 Lost Circulation Occurred
1990-06-14 Surface Casing Operation Performed
1990-06-16 Direction Drilling Operation Performed - Deviate
1990-06-19 Drill Stem Test Performed
1990-07-09 Finished Drilling
1990-07-09 Well Mode changed to Drilled and Cased
1990-07-10 Well Log Performed
1990-07-11 Well Log Performed
1990-07-12 Drill Stem Test Performed
1990-07-12 Well Log Performed
1990-07-13 Plug Back Performed
1990-07-13 Well Log Performed
1990-07-14 Production Casing Operation Performed
1990-07-14 Rig Released
1990-07-17 Well Log Performed
1990-08-16 Well Log Performed
1990-09-03 Well Log Performed
1990-09-04 Perforation Treatment Performed - Jet Perforation
1990-09-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-09-07 Perforation Treatment Performed - Cement Squeeze
1990-09-08 Perforation Treatment Performed - Jet Perforation
1990-09-08 Well Log Performed
1990-09-09 Perforation Treatment Performed - Acid Wash - No Pressure
1990-09-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-09-14 Perforation Treatment Performed - Cement Squeeze
1990-09-17 Perforation Treatment Performed - Jet Perforation
1990-09-17 Well Log Performed
1990-09-18 Well Log Performed
1990-09-19 Perforation Treatment Performed - Fractured
1990-09-20 Perforation Treatment Performed - Fractured
1990-09-24 Well Log Performed
1990-11-01 Well Began Production
1990-11-01 Well Fluid changed to Crude Oil
1990-11-01 Well Mode changed to Pumping
1991-03-13 Well Log Performed
1993-03-31 Well Fluid changed to Crude Oil
1993-03-31 Well Mode changed to Suspended
1994-01-05 Well Log Performed
1994-01-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-01-06 Plug Back Performed
1994-01-06 Well Log Performed
1994-01-07 Perforation Treatment Performed - Jet Perforation
1994-01-20 Perforation Treatment Performed - Fractured
1994-02-10 Well Log Performed
1994-02-12 Perforation Treatment Performed - Cement Squeeze
1994-02-12 Plug Back Performed
1994-02-12 Well Log Performed
1994-02-14 Perforation Treatment Performed - Jet Perforation
1994-02-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-02-16 Plug Back Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1990-06-16 835.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-09-04 Perforation 1527.00 1531.00 13
1990-09-20 Fracture 1512.00 1515.00 0
1994-01-06 Packing Device Capped w/Cement 1487.00 1500.00 0
1994-01-07 Perforation 1199.00 1205.00 13
1994-01-20 Fracture 1199.00 1205.00 0
1994-02-12 Cement Squeeze 1199.00 1205.00 0
1994-02-14 Perforation 1183.00 1185.00 14
1994-02-16 Packing Device Capped w/Cement 1169.00 1178.00 0
1990-09-05 Acid Treatment 1527.00 1531.00 0
1990-09-07 Cement Squeeze 1527.00 1531.00 0
1990-09-08 Perforation 1514.00 1519.00 13
1990-09-09 Acid Wash 1514.00 1519.00 0
1990-09-12 Acid Treatment 1514.00 1517.00 0
1990-09-14 Cement Squeeze 1514.00 1519.00 0
1990-09-17 Perforation 1512.00 1515.00 13
1990-09-19 Fracture 1512.00 1515.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 1337 0.0 0.0 0.0
1991 6664 0.0 0.0 0.0
1992 8650 0.0 0.0 0.0
1993 1521 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1990-06-12 Lost Circulation 125.00 144.00

For data sources see[7]

References