If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0816082213003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.027292,"lon":-119.150031,"icon":""}]} |
Location: 00/13-22-081-08W6/3 | |
Location Alias: 00/13-22-81-08 W6M | |
Location Alias 2: 00/13-22-081-08 W6/03 | |
Country: Canada | |
Province: Alberta | |
Township: 081 | |
Meridian: 6 | |
Range: 08 | |
Section: 22 | |
County/Municipality: Saddle Hills County | |
Well Name: TOURMALINE HZ MULLIGAN 13-22-81-8 | |
Operator Name: Tourmaline Oil Corp. | |
License Number: 0462269 | |
License Date: 2013-12-11 | |
License Status: Suspension | |
Spud Date: 2013-12-16 | |
Final Drill Date: 2014-01-11 | |
Well Total Depth: 3094.00 m | |
Surface Hole Latitude: 56.027292 | |
Surface Hole Longitude: -119.150031 |
Date | Event |
---|---|
2013-12-11 | Obtained License |
2013-12-19 | Surface Casing Operation Performed |
2014-01-02 | Direction Drilling Operation Performed - Deviate |
2014-01-02 | Direction Drilling Operation Performed - Horizontal |
2014-01-05 | Direction Drilling Operation Performed - Horizontal |
2014-01-11 | Finished Drilling |
2014-01-11 | Well Mode changed to Drilled and Cased |
2014-01-14 | Production Casing Operation Performed |
2014-01-14 | Rig Released |
2014-02-04 | Well Log Performed |
2014-02-06 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-02-08 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2014-02-13 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-02-14 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-08-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2017-08-10 | Plug Back Performed |
2017-08-11 | Perforation Treatment Performed - Jet Perforation |
2017-09-06 | Well Began Production |
2017-09-06 | Well Fluid changed to Gas |
2017-09-06 | Well Mode changed to Flowing |
2018-08-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2018-08-18 | Plug Back Performed |
2018-08-18 | Well Fluid changed to Gas |
2018-08-18 | Well Mode changed to Abandoned Zone |
2018-08-21 | Perforation Treatment Performed - Jet Perforation |
2018-08-21 | Well Log Performed |
2019-07-01 | Well Fluid changed to Gas |
2019-07-01 | Well Mode changed to Suspended |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2014-01-02 | 845.00 | Horizontal |
2014-01-02 | 863.20 | Deviate (5 - 79 degrees) |
2014-01-05 | 1323.80 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2014-02-06 | Multi-Stage Fracture | 3066.40 | 3066.50 | 0 |
2014-02-13 | Multi-Stage Fracture | 2560.00 | 2560.10 | 0 |
2014-02-13 | Multi-Stage Fracture | 2501.70 | 2501.80 | 0 |
2014-02-13 | Multi-Stage Fracture | 2430.10 | 2430.20 | 0 |
2014-02-13 | Multi-Stage Fracture | 2371.90 | 2372.00 | 0 |
2014-02-13 | Multi-Stage Fracture | 2300.30 | 2300.40 | 0 |
2014-02-13 | Multi-Stage Fracture | 2242.00 | 2242.10 | 0 |
2014-02-13 | Multi-Stage Fracture | 2170.40 | 2170.50 | 0 |
2014-02-13 | Multi-Stage Fracture | 2112.20 | 2112.30 | 0 |
2014-02-13 | Multi-Stage Fracture | 2040.90 | 2041.00 | 0 |
2014-02-13 | Multi-Stage Fracture | 1969.30 | 1969.40 | 0 |
2014-02-08 | Acid Treatment | 3066.40 | 3066.50 | 0 |
2014-02-14 | Multi-Stage Fracture | 1897.70 | 1897.80 | 0 |
2014-02-14 | Multi-Stage Fracture | 1826.10 | 1826.20 | 0 |
2014-02-14 | Multi-Stage Fracture | 1754.40 | 1754.50 | 0 |
2014-02-14 | Multi-Stage Fracture | 1682.20 | 1682.30 | 0 |
2014-02-14 | Multi-Stage Fracture | 1611.20 | 1611.30 | 0 |
2014-02-14 | Multi-Stage Fracture | 1539.60 | 1539.70 | 0 |
2014-02-14 | Multi-Stage Fracture | 1481.40 | 1481.50 | 0 |
2014-02-14 | Multi-Stage Fracture | 1423.10 | 1423.20 | 0 |
2017-08-10 | Packing Device Capped w/Cement | 1240.00 | 1269.80 | 0 |
2017-08-11 | Perforation | 1083.00 | 1088.00 | 13 |
2014-02-13 | Multi-Stage Fracture | 3007.80 | 3007.90 | 0 |
2018-08-18 | Packing Device Capped w/Cement | 1065.00 | 1077.00 | 0 |
2018-08-21 | Perforation | 102.00 | 106.00 | 17 |
2014-02-13 | Multi-Stage Fracture | 2936.20 | 2936.30 | 0 |
2014-02-13 | Multi-Stage Fracture | 2878.00 | 2878.10 | 0 |
2014-02-13 | Multi-Stage Fracture | 2806.40 | 2806.50 | 0 |
2014-02-13 | Multi-Stage Fracture | 2748.10 | 2748.20 | 0 |
2014-02-13 | Multi-Stage Fracture | 2689.80 | 2689.90 | 0 |
2014-02-13 | Multi-Stage Fracture | 2618.20 | 2618.30 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2017 | 2581 | 0.0 | 0.0 | 0.0 |
2018 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2014-01-11 | No Incident Encountered | 0.00 | 0.00 |
2014-02-26 | No Incident Encountered | 0.00 | 0.00 |
2017-08-14 | No Incident Encountered | 0.00 | 0.00 |
2018-08-22 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]