X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0816071816020

Well Details

Well ID: 0816071816020
Loading map...
Location: 02/16-18-081-07W6/0
Location Alias: 02/16-18-81-07 W6M
Location Alias 2: 02/16-18-081-07 W6/00
Country: Canada
Province: Alberta
Township: 081
Meridian: 6
Range: 07
Section: 18
County/Municipality: Saddle Hills County
Well Name: TOURMALINE 102 MULLIGAN 16-18-81-7
Operator Name: Tourmaline Oil Corp.
License Number: 0459878
License Date: 2013-10-04
License Status: Issued
Spud Date: 2013-11-27
Final Drill Date: 2013-12-08
Well Total Depth: 3010.00 m
Surface Hole Latitude: 56.039167
Surface Hole Longitude: -119.095333

For data sources see[1][2]

Well History

Date Event
2013-10-04 Obtained License
2013-11-28 Surface Casing Operation Performed
2013-11-30 Direction Drilling Operation Performed - Deviate
2013-12-02 Direction Drilling Operation Performed - Horizontal
2013-12-02 Well Log Performed
2013-12-08 Finished Drilling
2013-12-08 Well Mode changed to Drilled and Cased
2013-12-11 Production Casing Operation Performed
2013-12-12 Rig Released
2013-12-17 Well Log Performed
2014-01-06 Perforation Treatment Performed - Acid Squeeze - Press Used
2014-01-06 Perforation Treatment Performed - Multi-Stage Fracture
2014-01-07 Perforation Treatment Performed - Multi-Stage Fracture
2014-01-08 Perforation Treatment Performed - Multi-Stage Fracture
2014-01-20 Well Began Production
2014-01-20 Well Fluid changed to Crude Oil
2014-01-20 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2013-11-27 Beaver Drilling Ltd. 9 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2013-11-30 872.50 Deviate (5 - 79 degrees)
2013-12-02 1317.10 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-01-06 Multi-Stage Fracture 2982.20 2982.30 0
2014-01-08 Multi-Stage Fracture 2520.00 2520.10 0
2014-01-08 Multi-Stage Fracture 2462.60 2462.70 0
2014-01-08 Multi-Stage Fracture 2407.40 2407.50 0
2014-01-08 Multi-Stage Fracture 2349.10 2349.20 0
2014-01-08 Multi-Stage Fracture 2290.70 2290.80 0
2014-01-08 Multi-Stage Fracture 2234.00 2234.10 0
2014-01-08 Multi-Stage Fracture 2175.60 2175.70 0
2014-01-08 Multi-Stage Fracture 2117.20 2117.30 0
2014-01-08 Multi-Stage Fracture 2058.80 2058.90 0
2014-01-08 Multi-Stage Fracture 2000.30 2000.40 0
2014-01-06 Acid Treatment 2982.20 2982.30 0
2014-01-08 Multi-Stage Fracture 1941.90 1942.00 0
2014-01-08 Multi-Stage Fracture 1885.10 1885.20 0
2014-01-08 Multi-Stage Fracture 1830.50 1830.60 0
2014-01-08 Multi-Stage Fracture 1760.30 1760.40 0
2014-01-08 Multi-Stage Fracture 1688.40 1688.50 0
2014-01-08 Multi-Stage Fracture 1616.70 1616.80 0
2014-01-08 Multi-Stage Fracture 1545.10 1545.20 0
2014-01-08 Multi-Stage Fracture 1473.70 1473.80 0
2014-01-07 Multi-Stage Fracture 2924.20 2924.30 0
2014-01-07 Multi-Stage Fracture 2867.90 2868.00 0
2014-01-07 Multi-Stage Fracture 2809.60 2809.70 0
2014-01-08 Multi-Stage Fracture 2751.20 2751.30 0
2014-01-08 Multi-Stage Fracture 2692.80 2692.90 0
2014-01-08 Multi-Stage Fracture 2634.70 2634.80 0
2014-01-08 Multi-Stage Fracture 2576.70 2576.80 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-01-06 2014-01-08 1,173 4,282 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 88.2539 N/A
16/30 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 3.2319 N/A
16/30 SiberProp Calfrac Quartz 14808-60-7 100 1.6374 N/A
20/40 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 5.6074 N/A
50/140 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 0.838 N/A
Activator W Calfrac Activator Alcohols. C12-14-Secondary. Ethoxylated 84133-50-6 100 0.0551 N/A
Methanol 67-56-1 100 0.0555 N/A
Non-Hazardous Ingredients Trade Secret 100 0.059 N/A
DWP-962 Calfrac Bactericide/Biocide Phosphonium. tetrakis(hydroxymethyl)-. sulfate (2:1) (THPS) 55566-30-8 100 0.0176 N/A
Water 7732-18-5 100 0.0182 N/A
DWP-913 Calfrac Clay Control Non-Hazardous Ingredients Trade Secret 100 0.1136 N/A
DWP-937 Calfrac Demulsifier Citrus terpenes 94266-47-4 100 0.1209 N/A
Isopropanol 67-63-0 100 0.1217 N/A
Non-Hazardous Ingredients Trade Secret 100 0.1209 N/A
Triethylene glycol 112-27-6 100 0.1217 N/A
Water 7732-18-5 100 0.1213 N/A
DWP-602 Calfrac Friction Reducer Non-Hazardous Ingredients Trade Secret 100 0.1251 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-01-04 2014-01-06 Surface Water - Runoff 3364
2013-12-13 2013-12-20 Recycled Fracturing Water (treated at well site) 398
2013-12-20 2013-12-20 Recycled Fracturing Water (treated at well site) 520

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 858 0.0 0.0 0.0
2015 3799 0.0 0.0 0.0
2016 6971 0.0 0.0 0.0
2017 6515 0.0 0.0 0.0
2018 7104 0.0 0.0 0.0
2019 6065 0.0 0.0 0.0
2020 2033 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-12-08 No Incident Encountered 0.00 0.00
2014-01-24 No Incident Encountered 0.00 0.00

For data sources see[10]

References