X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0816060406000

Well Details

Well ID: 0816060406000
Loading map...
Location: 00/06-04-081-06W6/0
Location Alias: 00/06-04-81-06 W6M
Location Alias 2: 00/06-04-081-06 W6/00
Country: Canada
Province: Alberta
Township: 081
Meridian: 6
Range: 06
Section: 04
County/Municipality: Saddle Hills County
Well Name: HUDSON'S BAY UNION DUNVEGAN NO. 1
Operator Name: BP Canada Energy Group ULC
License Number: 0004150
License Date: 1952-01-30
License Status: RecCertified
Spud Date: 1952-01-31
Final Drill Date: 1952-03-05
Well Total Depth: 1181.40 m
Surface Hole Latitude: 55.990794
Surface Hole Longitude: -118.877980

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-01-30 Obtained License
1952-01-31 Lost Circulation Occurred
1952-02-09 Drill Stem Test Performed
1952-02-20 Drill Stem Test Performed
1952-02-21 Drill Stem Test Performed
1952-02-24 Drill Stem Test Performed
1952-02-26 Drill Stem Test Performed
1952-02-28 Drill Stem Test Performed
1952-03-03 Drill Stem Test Performed
1952-03-05 Drill Stem Test Performed
1952-03-05 Finished Drilling
1952-03-05 Well Mode changed to Drilled and Cased
1952-03-08 Production Casing Operation Performed
1957-09-20 Perforation Treatment Performed - Bullet Perforation
1959-04-10 Well Began Production
1959-04-10 Well Fluid changed to Gas
1959-04-10 Well Mode changed to Flowing
1960-09-25 Perforation Treatment Performed - Abrasa-Jet Perforation
1960-09-27 Perforation Treatment Performed - Cement Squeeze
1960-09-28 Perforation Treatment Performed - Jet Perforation
1960-09-30 Perforation Treatment Performed - Acid Wash - No Pressure
1962-02-03 Perforation Treatment Performed - Cement Squeeze
1962-02-10 Perforation Treatment Performed - Abrasa-Jet Perforation
1962-02-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-02-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-02-13 Perforation Treatment Performed - Bullet Perforation
1962-02-23 Well Fluid changed to Gas
1962-02-23 Well Mode changed to Suspended
1967-07-21 Perforation Treatment Performed - Cement Plug
1967-07-21 Well Abandoned
1967-07-21 Well Fluid changed to Gas
1967-07-21 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1957-09-20 Bullet Perforation 1001.00 1003.10 13
1962-02-13 Acid Treatment 1001.30 1001.60 0
1967-07-21 Cement Plug 986.00 1003.10 0
1960-09-25 Hydra Jet Perforation 1005.50 1005.50 0
1960-09-27 Cement Squeeze 1005.50 1005.50 0
1960-09-28 Perforation 1001.30 1002.80 13
1960-09-30 Acid Wash 1001.30 1002.80 0
1962-02-03 Cement Squeeze 1001.00 1003.10 0
1962-02-10 Hydra Jet Perforation 1001.60 1001.60 0
1962-02-12 Acid Treatment 1001.60 1001.60 0
1962-02-13 Bullet Perforation 1001.30 1001.60 26

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1952-01-31 Lost Circulation 10.00 10.00

For data sources see[6]

References