If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0816060406000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.990794,"lon":-118.87798,"icon":""}]} |
Location: 00/06-04-081-06W6/0 | |
Location Alias: 00/06-04-81-06 W6M | |
Location Alias 2: 00/06-04-081-06 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 081 | |
Meridian: 6 | |
Range: 06 | |
Section: 04 | |
County/Municipality: Saddle Hills County | |
Well Name: HUDSON'S BAY UNION DUNVEGAN NO. 1 | |
Operator Name: BP Canada Energy Group ULC | |
License Number: 0004150 | |
License Date: 1952-01-30 | |
License Status: RecCertified | |
Spud Date: 1952-01-31 | |
Final Drill Date: 1952-03-05 | |
Well Total Depth: 1181.40 m | |
Surface Hole Latitude: 55.990794 | |
Surface Hole Longitude: -118.877980 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1952-01-30 | Obtained License |
1952-01-31 | Lost Circulation Occurred |
1952-02-09 | Drill Stem Test Performed |
1952-02-20 | Drill Stem Test Performed |
1952-02-21 | Drill Stem Test Performed |
1952-02-24 | Drill Stem Test Performed |
1952-02-26 | Drill Stem Test Performed |
1952-02-28 | Drill Stem Test Performed |
1952-03-03 | Drill Stem Test Performed |
1952-03-05 | Drill Stem Test Performed |
1952-03-05 | Finished Drilling |
1952-03-05 | Well Mode changed to Drilled and Cased |
1952-03-08 | Production Casing Operation Performed |
1957-09-20 | Perforation Treatment Performed - Bullet Perforation |
1959-04-10 | Well Began Production |
1959-04-10 | Well Fluid changed to Gas |
1959-04-10 | Well Mode changed to Flowing |
1960-09-25 | Perforation Treatment Performed - Abrasa-Jet Perforation |
1960-09-27 | Perforation Treatment Performed - Cement Squeeze |
1960-09-28 | Perforation Treatment Performed - Jet Perforation |
1960-09-30 | Perforation Treatment Performed - Acid Wash - No Pressure |
1962-02-03 | Perforation Treatment Performed - Cement Squeeze |
1962-02-10 | Perforation Treatment Performed - Abrasa-Jet Perforation |
1962-02-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1962-02-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1962-02-13 | Perforation Treatment Performed - Bullet Perforation |
1962-02-23 | Well Fluid changed to Gas |
1962-02-23 | Well Mode changed to Suspended |
1967-07-21 | Perforation Treatment Performed - Cement Plug |
1967-07-21 | Well Abandoned |
1967-07-21 | Well Fluid changed to Gas |
1967-07-21 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1957-09-20 | Bullet Perforation | 1001.00 | 1003.10 | 13 |
1962-02-13 | Acid Treatment | 1001.30 | 1001.60 | 0 |
1967-07-21 | Cement Plug | 986.00 | 1003.10 | 0 |
1960-09-25 | Hydra Jet Perforation | 1005.50 | 1005.50 | 0 |
1960-09-27 | Cement Squeeze | 1005.50 | 1005.50 | 0 |
1960-09-28 | Perforation | 1001.30 | 1002.80 | 13 |
1960-09-30 | Acid Wash | 1001.30 | 1002.80 | 0 |
1962-02-03 | Cement Squeeze | 1001.00 | 1003.10 | 0 |
1962-02-10 | Hydra Jet Perforation | 1001.60 | 1001.60 | 0 |
1962-02-12 | Acid Treatment | 1001.60 | 1001.60 | 0 |
1962-02-13 | Bullet Perforation | 1001.30 | 1001.60 | 26 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1952-01-31 | Lost Circulation | 10.00 | 10.00 |
For data sources see[6]